BBS Architects Engineers

Iowa State University

ETRC Hoover Hall
ETRC Hoover Hall
ETRC Hoover Hall
ETRC Hoover Hall
ETRC Hoover Hall

Completion Date: October 2003
Project Data: 80,000 GSF
Construction Cost: $15.1 million

Client Need:
The Engineering Teaching and Research Complex (ETRC), located on the Iowa State University Campus, was planned to bring together two major entities of the University: the College of Engineering and the Institute for Physical Research and Technology (IPRT) in a way that would advance engineering education, applied research, and outreach capabilities. The stated goal of the university was to have a complex possessing a timeless character, devoid of any particular architectural style. Hoover Hall was envisioned to sit comfortably in its surrounding architectural context while enhancing the already established and distinctive identity of ETRC.

BBS Approach:
Brooks Borg Skiles and Ellerbe Beckett collaborated on the design of the Complex.

Project Results:

  • Howe Hall, the first of two buildings for ETRC, was completed in 2000.
  • The second building, Hoover Hall, completed in 2003, was envisioned to house a diverse and interactive group of functions ranging from research and teaching labs to specialized classrooms.
  • Hoover Hall occupies the southern edge of the site framing the existing historic Marston Water Tower located on the northeast corner of the site.
Goodnow Hall Restoration & Renovation
Kemin Food Sciences Lab Renovation
Beardshear Hall Remodeling
Biological Sciences Facility
Geoffroy Residence Hall
MacKay Hall Auditorium Renovation
LeBaron Hall Replacement Study
Levitt Center for University Advancement
Sabin Hall Renovation – LEED Gold
Chemistry Building Addition & Renovation
College of Human Sciences
VRAC C6 and Office Suite
Extension 4-H Youth Building
Coover Hall Infrastructure Study
ETRC Howe Hall
© 2019 BBS Architects | engineers, All rights reserved.