BBS Architects Engineers

BBS Architects Engineers Office

Owner: BBS Architects | Engineers

Architectural and Engineering Design Services: BBS Architects | Engineers

General Contractor: Neumann Brothers, Inc.

Construction Completed: 2017

Project Data: 6,130 sf

 

Client Need: After 10 years we decided we needed an upgrade in our office to better represent our working style and current staff. The centralized core divided the engineering department and architectural department making it difficult for collaboration; the tinted single pane windows allowed little light into the space while offering no insulation. Several small meeting spaces were set up for collaborative meetings but were rarely used. 

BBS Approach: The tenant space on ground level of 219 offered a naturally lit space with high ceilings and an open floor plan. By consolidating our past meeting areas into one private conference room and one open multi-use space we were able to move from a larger floor plan to a smaller one. The engineering and architectural departments are connected in an open office layout making interoffice collaboration easier. The Materials Library is organized in several shelves with an open table for layout space and material boards. Tack-able wall space allows a space for displaying finished work, sketches, process drawings and photos, or material boards. 

Project Results:

  • Connectivity between architects and engineers
  • Street Presence
  • Multi-use open collaboration meeting areas
  • Natural lighting
  • Efficient and well lit library and layout space
Arizona Farm Bureau Center
Iowa Events Center
LeBaron Hall Replacement Study
IADA Office Renovation
Food Sciences Building - Room 2379 Renovation
Kemin Food Sciences Lab Renovation
Hospital Emergency Room Renovation & Expansion
ABC - Office Build-Out
Executive Suites Renovation
Science Center - New Facility
Coover Hall Infrastructure Study
Hub Tower Office Tenant Improvement
Corporate Highrise
New Office
College of Human Sciences
Corporate Headquarters Renovation
Lincoln High School Improvements
Memorial Union Food Court
Parking Garage
Minnesota Farm Bureau Center
Dodge House Renovations
Monroe Elementary School Improvements
Camp Dodge Pool Campus Improvements
Beardshear Hall Remodeling
Terminal
Covered Walkway
Union Drive Community Center Renovations
VRAC C6 and Office Suite
Wright Elementary Reimagined
Sabin Hall Renovation – LEED Gold
Goodnow Hall Restoration & Renovation
Reid “E” Research Facility
219 Eighth Street
Extension 4-H Youth Building
Lance and Ellie's Sandwich Shop
Hub Tower Conference Center
Moulton Performing & Visual Arts Signature School
Theodore Roosevelt High School Natatorium Improvements
Innovation & Discovery Academy (STEM)
Beardshear Hall Office Renovation
Camp Dodge Chapel Addition and Renovation
Des Moines Public Market
Biological Sciences Facility
Utah Farm Bureau Center
ETRC Hoover Hall
ETRC Howe Hall
Global Neighbors
Office Renovation
Common Ground - Coffee Shop
Chemistry Building Addition & Renovation
Levitt Center for University Advancement
Catholic Pastoral Center Rehabilitation
MacKay Hall Auditorium Renovation
Administration Building Renovation and Addition
Iowa City Federal Building - VHA Renovations
Home Office Building with Expansion
Wyoming Farm Bureau Center
Corporate Headquarters
© 2026 BBS Architects | engineers, All rights reserved.