BBS Architects Engineers

EMC Insurance Companies

EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise

Owner: EMC Insurance Companies
Architectural and Engineering Design Services: BBS Architects | Engineers
Construction Completed: 1997
Project Data: 430,000 SF
Construction Cost: $53,000,000

Client Need:
EMC expanded their downtown Des Moines location by adding this corporate high-rise adjacent to their existing headquarters building. They sought to achieve a bold and sophisticated image through the building design.

BBS Approach:
The sculptural expression was developed to take advantage of the building’s location within the skyline. Viewed from the west, the angled roof acts to counter the gradual decline of heights from north to south along the downtown skyline. Viewed from the south, the higher tower face establishes a strong figural identity for the EMC complex.

Project Results:

  • 430,000 SF expansion
  • 20-story office tower plus three-story support facility
  • Addition of three new skywalks
  • Two-level underground parking facility
  • Sophisticated cladding technology
  • Cutting-edge mechanical/electrical system
  • Advanced energy-conservation design:
    • Thermal storage
    • Low temperature air distribution
    • High-efficiency (R-7) windows

Industry Recognition:

  • When constructed, the EMC tower was the largest US installation of innovative “rainscreen” system
  • Awarded First Place in regional technology by the American Society of Refrigerating and Air Conditioning Engineers (ASHRAE)
BBS at 219 8th Street
Hub Tower Conference Center
Union Drive Community Center Renovations
Corporate Headquarters
Corporate Headquarters Renovation
College of Human Sciences
Home Office Building with Expansion
Beardshear Hall Office Renovation
VRAC C6 and Office Suite
Beardshear Hall Remodeling
Des Moines Public Market
Chemistry Building Addition & Renovation
Monroe Elementary School Improvements
Food Sciences Building - Room 2379 Renovation
MacKay Hall Auditorium Renovation
Lance and Ellie's Sandwich Shop
Camp Dodge Pool Campus Improvements
Hub Tower Office Tenant Improvement
Dodge House Renovations
Reid “E” Research Facility
Lincoln High School Improvements
Wyoming Farm Bureau Center
Theodore Roosevelt High School Natatorium Improvements
Memorial Union Food Court
Iowa Events Center
ABC - Office Build-Out
Extension 4-H Youth Building
Levitt Center for University Advancement
Coover Hall Infrastructure Study
Goodnow Hall Restoration & Renovation
New Office
Covered Walkway
Administration Building Renovation and Addition
Arizona Farm Bureau Center
Moulton Performing & Visual Arts Signature School
Biological Sciences Facility
Common Ground - Coffee Shop
Terminal
Science Center - New Facility
Office Renovation
Kemin Food Sciences Lab Renovation
Camp Dodge Chapel Addition and Renovation
LeBaron Hall Replacement Study
ETRC Howe Hall
219 Eighth Street
Minnesota Farm Bureau Center
Global Neighbors
Sabin Hall Renovation – LEED Gold
Innovation & Discovery Academy (STEM)
Iowa City Federal Building - VHA Renovations
IADA Office Renovation
Catholic Pastoral Center Rehabilitation
Executive Suites Renovation
Wright Elementary Reimagined
ETRC Hoover Hall
Parking Garage
Hospital Emergency Room Renovation & Expansion
Utah Farm Bureau Center
© 2026 BBS Architects | engineers, All rights reserved.