BBS Architects Engineers

Iowa State University

ETRC Hoover Hall
ETRC Hoover Hall
ETRC Hoover Hall
ETRC Hoover Hall
ETRC Hoover Hall

Completion Date: October 2003
Project Data: 80,000 GSF
Construction Cost: $15.1 million

Client Need:
The Engineering Teaching and Research Complex (ETRC), located on the Iowa State University Campus, was planned to bring together two major entities of the University: the College of Engineering and the Institute for Physical Research and Technology (IPRT) in a way that would advance engineering education, applied research, and outreach capabilities. The stated goal of the university was to have a complex possessing a timeless character, devoid of any particular architectural style. Hoover Hall was envisioned to sit comfortably in its surrounding architectural context while enhancing the already established and distinctive identity of ETRC.

BBS Approach:
Brooks Borg Skiles and Ellerbe Beckett collaborated on the design of the Complex.

Project Results:

  • Howe Hall, the first of two buildings for ETRC, was completed in 2000.
  • The second building, Hoover Hall, completed in 2003, was envisioned to house a diverse and interactive group of functions ranging from research and teaching labs to specialized classrooms.
  • Hoover Hall occupies the southern edge of the site framing the existing historic Marston Water Tower located on the northeast corner of the site.
New Office
Levitt Center for University Advancement
Chemistry Building Addition & Renovation
Arizona Farm Bureau Center
Coover Hall Infrastructure Study
ETRC Howe Hall
College of Human Sciences
MacKay Hall Auditorium Renovation
Terminal
Corporate Headquarters Renovation
Lance and Ellie's Sandwich Shop
Dodge House Renovations
Iowa Events Center
Catholic Pastoral Center Rehabilitation
Home Office Building with Expansion
Reid “E” Research Facility
Covered Walkway
Office Renovation
LeBaron Hall Replacement Study
Sabin Hall Renovation – LEED Gold
Minnesota Farm Bureau Center
ABC - Office Build-Out
Camp Dodge Pool Campus Improvements
VRAC C6 and Office Suite
Wyoming Farm Bureau Center
Beardshear Hall Remodeling
Corporate Highrise
Iowa City Federal Building - VHA Renovations
Goodnow Hall Restoration & Renovation
Union Drive Community Center Renovations
IADA Office Renovation
Hub Tower Office Tenant Improvement
Memorial Union Food Court
Common Ground - Coffee Shop
Hospital Emergency Room Renovation & Expansion
BBS at 219 8th Street
Parking Garage
219 Eighth Street
Biological Sciences Facility
Kemin Food Sciences Lab Renovation
Des Moines Public Market
Food Sciences Building - Room 2379 Renovation
Utah Farm Bureau Center
Hub Tower Conference Center
Science Center - New Facility
Extension 4-H Youth Building
Hub Tower Elevator Modernization
Executive Suites Renovation
Camp Dodge Chapel Addition and Renovation
Corporate Headquarters
© 2025 BBS Architects | engineers, All rights reserved.