BBS Architects Engineers

Iowa State University

ETRC Hoover Hall
ETRC Hoover Hall
ETRC Hoover Hall
ETRC Hoover Hall
ETRC Hoover Hall

Completion Date: October 2003
Project Data: 80,000 GSF
Construction Cost: $15.1 million

Client Need:
The Engineering Teaching and Research Complex (ETRC), located on the Iowa State University Campus, was planned to bring together two major entities of the University: the College of Engineering and the Institute for Physical Research and Technology (IPRT) in a way that would advance engineering education, applied research, and outreach capabilities. The stated goal of the university was to have a complex possessing a timeless character, devoid of any particular architectural style. Hoover Hall was envisioned to sit comfortably in its surrounding architectural context while enhancing the already established and distinctive identity of ETRC.

BBS Approach:
Brooks Borg Skiles and Ellerbe Beckett collaborated on the design of the Complex.

Project Results:

  • Howe Hall, the first of two buildings for ETRC, was completed in 2000.
  • The second building, Hoover Hall, completed in 2003, was envisioned to house a diverse and interactive group of functions ranging from research and teaching labs to specialized classrooms.
  • Hoover Hall occupies the southern edge of the site framing the existing historic Marston Water Tower located on the northeast corner of the site.
219 Eighth Street
Wyoming Farm Bureau Center
Corporate Highrise
Covered Walkway
College of Human Sciences
Office Renovation
Beardshear Hall Remodeling
Hub Tower Office Tenant Improvement
Catholic Pastoral Center Rehabilitation
Goodnow Hall Restoration & Renovation
Arizona Farm Bureau Center
Biological Sciences Facility
Reid “E” Research Facility
Levitt Center for University Advancement
Home Office Building with Expansion
Executive Suites Renovation
Corporate Headquarters
Hospital Emergency Room Renovation & Expansion
Corporate Headquarters
MacKay Hall Auditorium Renovation
Coover Hall Infrastructure Study
Extension 4-H Youth Building
Kemin Food Sciences Lab Renovation
Minnesota Farm Bureau Center
VRAC C6 and Office Suite
Dodge House Renovations
Chemistry Building Addition & Renovation
Utah Farm Bureau Center
LeBaron Hall Replacement Study
Corporate Headquarters Renovation
ETRC Howe Hall
New Facility
Camp Dodge Pool Campus Improvements
Hub Tower Conference Center
Sabin Hall Renovation – LEED Gold
Terminal
Iowa Events Center
New Office
Parking Garage
© 2019 BBS Architects | engineers, All rights reserved.