BBS Architects Engineers

Iowa State University

MacKay Hall Auditorium Renovation
MacKay Hall Auditorium Renovation
MacKay Hall Auditorium Renovation
MacKay Hall Auditorium Renovation
MacKay Hall Auditorium Renovation
MacKay Hall Auditorium Renovation

Construction Data:
Size: 8,340 GSF Renovation
Construction Cost:

  • Estimated: $2,007,887
  • Bid: $1,928,000
  • Final: $2,155,488

Completion Date: 2014
 

The location, size and historical character of MacKay Hall establish this building and the related MacKay Hall Auditorium as significant landmarks within the context of the ISU campus. The design team was challenged by ISU’s College of Human Sciences to transform underutilized spaces in the building into enticing teaching and learning spaces to serve Iowa State’s rapidly growing student body.

The renovation of the first floor auditorium and adjacent spaces creates an optimum learning environment for 215 students within a rehabilitated historic envelope. An isolated balcony was removed in favor of stadium style platforms with swivel seating to facilitate interactive learning. State of the art lighting and communications technology complete the transformation.

Behind the seating platforms on first floor, a former lounge has been transformed to a welcome center functionally and visibly with two new offices and glass partitions. An adjacent corridor and large entry vestibule were rehabilitated to preserve historic materials. Batchelder tile fountains and a Christian Petersen designed sculpture were restored by the University.

Above the vestibule on second floor, a lecture room with stepped seating and obsolete fixed furniture was fully renovated into a 36 student classroom to meet the demand for small group interactive classes. Movable furniture, computer monitors and portable marker boards facilitate flexible and group learning.

LeBaron Hall Replacement Study
Terminal
Biological Sciences Facility
Camp Dodge Pool Campus Improvements
Levitt Center for University Advancement
Covered Walkway
Minnesota Farm Bureau Center
Arizona Farm Bureau Center
Chemistry Building Addition & Renovation
Catholic Pastoral Center Rehabilitation
Beardshear Hall Remodeling
Coover Hall Infrastructure Study
Corporate Headquarters Renovation
Dodge House Renovations
Wyoming Farm Bureau Center
ETRC Hoover Hall
Parking Garage
New Facility
Hub Tower Conference Center
Home Office Building with Expansion
New Office
Executive Suites Renovation
Sabin Hall Renovation – LEED Gold
Hub Tower Office Tenant Improvement
Office Renovation
219 Eighth Street
Iowa Events Center
VRAC C6 and Office Suite
College of Human Sciences
Corporate Headquarters
Kemin Food Sciences Lab Renovation
Reid “E” Research Facility
Corporate Highrise
Goodnow Hall Restoration & Renovation
Corporate Headquarters
Extension 4-H Youth Building
Utah Farm Bureau Center
ETRC Howe Hall
Hospital Emergency Room Renovation & Expansion
© 2019 BBS Architects | engineers, All rights reserved.