BBS Architects Engineers

Iowa State University

College of Human Sciences

Construction Data:

  • Human Nutritional Sciences Building: 34,400 SF
  • LeBaron Hall: 61,500 SF
  • MacKay Hall: 86,400 SF
  • Palmer Building: 34,400 SF

Completion Date: January 2014

Evolving space needs in four linked buildings near the heart of the ISU campus initiated this study of the building systems to determine how well the existing buildings will support programmatic needs. The Dean of the College and Facilities Planning and Management requested a summative graphic document that would quickly communicate conclusions reached in the study. A series of green-yellow-red color coded plans summarize good-fair-poor conditions for each primary system. A detailed narrative and spreadsheets provide the in-depth information needed to support future maintenance and planning strategies by the University.

BBS Architects | Engineers reviewed existing drawings and performed a visual assessment to prepare the report. Conditions and capacities of each primary site and building system were assessed including primary mechanical and electrical equipment. Architectural spatial quality was also reviewed. Corridor and wayfinding systems, restroom locations and capacities, and general visual characteristics of entrances and primary spaces were documented.

Covered Walkway
Catholic Pastoral Center Rehabilitation
Parking Garage
Dodge House Renovations
Coover Hall Infrastructure Study
New Office
ETRC Hoover Hall
ETRC Howe Hall
IADA Office Renovation
Sabin Hall Renovation – LEED Gold
Extension 4-H Youth Building
Goodnow Hall Restoration & Renovation
VRAC C6 and Office Suite
219 Eighth Street
LeBaron Hall Replacement Study
Hospital Emergency Room Renovation & Expansion
Memorial Union Food Court
Iowa City Federal Building - VHA Renovations
Utah Farm Bureau Center
Home Office Building with Expansion
Biological Sciences Facility
New Facility
Camp Dodge Pool Campus Improvements
Lance and Ellie's Sandwich Shop
Reid “E” Research Facility
Office Renovation
Kemin Food Sciences Lab Renovation
Corporate Headquarters Renovation
Arizona Farm Bureau Center
Executive Suites Renovation
Iowa Events Center
Corporate Highrise
Wyoming Farm Bureau Center
Chemistry Building Addition & Renovation
Hub Tower Office Tenant Improvement
Minnesota Farm Bureau Center
Food Sciences Building - Room 2379 Renovation
MacKay Hall Auditorium Renovation
Beardshear Hall Remodeling
Corporate Headquarters
Hub Tower Conference Center
Terminal
Levitt Center for University Advancement
Corporate Headquarters
© 2020 BBS Architects | engineers, All rights reserved.