BBS Architects Engineers

Iowa State University

College of Human Sciences

Construction Data:

  • Human Nutritional Sciences Building: 34,400 SF
  • LeBaron Hall: 61,500 SF
  • MacKay Hall: 86,400 SF
  • Palmer Building: 34,400 SF

Completion Date: January 2014

Evolving space needs in four linked buildings near the heart of the ISU campus initiated this study of the building systems to determine how well the existing buildings will support programmatic needs. The Dean of the College and Facilities Planning and Management requested a summative graphic document that would quickly communicate conclusions reached in the study. A series of green-yellow-red color coded plans summarize good-fair-poor conditions for each primary system. A detailed narrative and spreadsheets provide the in-depth information needed to support future maintenance and planning strategies by the University.

BBS Architects | Engineers reviewed existing drawings and performed a visual assessment to prepare the report. Conditions and capacities of each primary site and building system were assessed including primary mechanical and electrical equipment. Architectural spatial quality was also reviewed. Corridor and wayfinding systems, restroom locations and capacities, and general visual characteristics of entrances and primary spaces were documented.

Kemin Food Sciences Lab Renovation
Home Office Building with Expansion
Corporate Headquarters
IADA Office Renovation
Catholic Pastoral Center Rehabilitation
MacKay Hall Auditorium Renovation
Chemistry Building Addition & Renovation
ETRC Hoover Hall
ETRC Howe Hall
VRAC C6 and Office Suite
Common Ground - Coffee Shop
Biological Sciences Facility
Camp Dodge Pool Campus Improvements
Dodge House Renovations
Iowa Events Center
Minnesota Farm Bureau Center
Hub Tower Conference Center
ABC - Office Build-Out
BBS at 219 8th Street
Covered Walkway
Hub Tower Elevator Modernization
Lance and Ellie's Sandwich Shop
Iowa City Federal Building - VHA Renovations
Hospital Emergency Room Renovation & Expansion
Memorial Union Food Court
Camp Dodge Chapel Addition and Renovation
Wyoming Farm Bureau Center
New Office
Sabin Hall Renovation – LEED Gold
Science Center - New Facility
Beardshear Hall Remodeling
Hub Tower Office Tenant Improvement
Arizona Farm Bureau Center
Corporate Highrise
Union Drive Community Center Renovations
Utah Farm Bureau Center
LeBaron Hall Replacement Study
Executive Suites Renovation
219 Eighth Street
Extension 4-H Youth Building
Coover Hall Infrastructure Study
Terminal
Parking Garage
Des Moines Public Market
Food Sciences Building - Room 2379 Renovation
Goodnow Hall Restoration & Renovation
Corporate Headquarters Renovation
Levitt Center for University Advancement
Reid “E” Research Facility
Office Renovation
© 2024 BBS Architects | engineers, All rights reserved.