BBS Architects Engineers

Science Center of Iowa

Architectural Design Services: Zimmer Gunsul Frasca Partnership
Engineering Design Services: BBS Architects | Engineers
Project Data: 110,000 SF 
Construction Cost: $24,000,000 
Construction Completed: 2005

With a clear vision to “engage and inspire,” the Science Center of Iowa embarked on a process to provide a one-of-a-kind experience for children and adults. This vision and a well articulated pre-design programming process set the stage for the design team to create a facility for informal science learning. A downtown site in the heart of a rapidly developing entertainment/ residential/retail district provides a highly visible, easily accessible destination. The main building entrance is on axis with a downtown street and is further enhanced by a historic arched structural bridge frame over the street.

The entry experience is structured to inform visitors as they gradually proceed from ticketing and orientation to experience platforms. While individually selecting a desired exhibit experience, the visitors learn the concept that science is all around us and that science is something we can do every day. The exhibit environments have themes which include; Small Discoveries, Who Are We, When Things Get Moving, Why the Sky, and What on Earth.

The shape of the architecture was chosen to communicate the informal nature of the learning found within. A high sweeping curvilinear ceiling caps the lobby space and expresses the dynamic feeling of discovery. Two theaters, a large format film theater and a star theater are enclosed in metal clad cylindrical volumes and are clearly expressed on the outside. Exterior materials of terra cotta and brick are opened up in critical locations by glass curtainwall, for daylighting and full visibility of the retail, café, educational, and office spaces.

BBS provided structural, electrical, mechanical, plumbing engineering, and construction administration services to the team led by the Zimmer Gunsul Frasca Partnership.

Corporate Highrise
Theodore Roosevelt High School Natatorium Improvements
Iowa Events Center
Food Sciences Building - Room 2379 Renovation
Sabin Hall Renovation – LEED Gold
Utah Farm Bureau Center
Beardshear Hall Office Renovation
Beardshear Hall Remodeling
Camp Dodge Chapel Addition and Renovation
Corporate Headquarters
Executive Suites Renovation
Iowa City Federal Building - VHA Renovations
Kemin Food Sciences Lab Renovation
Corporate Headquarters Renovation
Hub Tower Office Tenant Improvement
Common Ground - Coffee Shop
MacKay Hall Auditorium Renovation
Hospital Emergency Room Renovation & Expansion
Des Moines Public Market
IADA Office Renovation
ABC - Office Build-Out
Lance and Ellie's Sandwich Shop
Dodge House Renovations
Memorial Union Food Court
Administration Building Renovation and Addition
Levitt Center for University Advancement
219 Eighth Street
Innovation & Discovery Academy (STEM)
Lincoln High School Improvements
Wright Elementary Reimagined
Minnesota Farm Bureau Center
New Office
BBS at 219 8th Street
Extension 4-H Youth Building
Moulton Performing & Visual Arts Signature School
Global Neighbors
Parking Garage
Reid “E” Research Facility
Camp Dodge Pool Campus Improvements
Catholic Pastoral Center Rehabilitation
Union Drive Community Center Renovations
Home Office Building with Expansion
Arizona Farm Bureau Center
Monroe Elementary School Improvements
College of Human Sciences
Terminal
VRAC C6 and Office Suite
Covered Walkway
Biological Sciences Facility
LeBaron Hall Replacement Study
Wyoming Farm Bureau Center
Hub Tower Conference Center
Goodnow Hall Restoration & Renovation
Chemistry Building Addition & Renovation
ETRC Hoover Hall
ETRC Howe Hall
Coover Hall Infrastructure Study
Office Renovation
© 2026 BBS Architects | engineers, All rights reserved.