BBS Architects Engineers

The University of Iowa

Biological Sciences Facility
Biological Sciences Facility
Biological Sciences Facility
Biological Sciences Facility

Project Data: 60,200 GSF
Construction Cost: $11,700,000
Construction Completed: 2000

Client Need:
The goal for Biology Building East was to be part of a multi-phase construction project to provide state-of-the-art teaching and research facilities for the Department of Biological Sciences. In addition to the new building, four existing Biology buildings will be renovated and provided with new mechanical, electrical and life safety systems

BBS Approach:
BBS provided design services to meet the client’s stated goal.

Project Results:

  • Construction of the new building allows the Department to vacate large sections of the existing facilities, enabling renovations and remodeling with minimal disruptions to ongoing teaching and research.
  • The building provides the Department with flexible teaching and research space, accommodating changing technologies and directions.
  • Teaching facilities are clustered on the first floor and include teaching labs, an auditorium, and seminar room.
  • Upper floors of the building contain research functions including a rooftop greenhouse.
  • Located across Dubuque Street from the existing buildings, a skywalk was designed to connect the new building to the existing Biology Complex.
Arizona Farm Bureau Center
MacKay Hall Auditorium Renovation
Corporate Headquarters
Coover Hall Infrastructure Study
219 Eighth Street
Corporate Highrise
Office Renovation
Goodnow Hall Restoration & Renovation
Hub Tower Office Tenant Improvement
Iowa Events Center
Extension 4-H Youth Building
ETRC Howe Hall
Utah Farm Bureau Center
Hub Tower Conference Center
Corporate Headquarters Renovation
Chemistry Building Addition & Renovation
Beardshear Hall Remodeling
Catholic Pastoral Center Rehabilitation
Kemin Food Sciences Lab Renovation
Wyoming Farm Bureau Center
Camp Dodge Pool Campus Improvements
Parking Garage
Minnesota Farm Bureau Center
College of Human Sciences
New Facility
VRAC C6 and Office Suite
Home Office Building with Expansion
Corporate Headquarters
Sabin Hall Renovation – LEED Gold
Dodge House Renovations
Executive Suites Renovation
Levitt Center for University Advancement
New Office
LeBaron Hall Replacement Study
Reid “E” Research Facility
Covered Walkway
ETRC Hoover Hall
Hospital Emergency Room Renovation & Expansion
Terminal
© 2019 BBS Architects | engineers, All rights reserved.