BBS Architects Engineers

The University of Iowa

Chemistry Building Addition & Renovation
Chemistry Building Addition & Renovation
Chemistry Building Addition & Renovation

Laboratory Consultant: Research Facilities Design
Project Data:

  • New Construction: 50,000 SF
  • Renovated Construction: 110,000 SF

Construction Completed: 2010
Construction Cost: $35,000,000–4 phases

BBS Architects | Engineers was selected to design a major addition and renovations that implement the initial phases of a long range master plan. The Chemistry Building, designed by the firm's predecessor firm in the 1920s and added to in the 1960s, occupies a full city block in the heart of the campus.

The schematic design approach recommended by BBSAE and approved by the University results in several advantages over previous planning recommendations by replacing the central portion of the building with new infill construction. This design provides teaching labs free from structural columns, optimizes the library layout on one floor level, enhances east-west internal circulation, zones high activity spaces to locations more directly accessible from the exterior, and locates Chemical Stores in a location more accessible for deliveries and building occupants.

The site design is closely integrated with the historic original 1920s building and steeply sloping site though the use of special pavings, brick piers with metal fencing and plantings. Service functions are grouped and screened. The new infill addition, visible from the north, is clad in brick with symmetrically arranged windows to visually transition between the adjacent 1920s building to the east and the 1960s addition to the west. New exit stairs screened by brick walls relate to the 1960s architecture of the west auditorium wing.

Teaching laboratories are positioned in the new infill addition and research laboratories in the existing northeast wing. Laboratories feature cutting edge high performance fume hoods to optimize user safety and life cycle costs. New classrooms, offices, lab and building support spaces are all designed for a growing chemistry department. The entire building is being improved with new windows and a fire sprinkler system. All construction was accomplished in 4 major phases while the chemistry department continuously occupied the building.

Des Moines Public Market
Union Drive Community Center Renovations
Camp Dodge Chapel Addition and Renovation
LeBaron Hall Replacement Study
MacKay Hall Auditorium Renovation
Wyoming Farm Bureau Center
ETRC Hoover Hall
Corporate Highrise
Science Center - New Facility
Common Ground - Coffee Shop
Terminal
IADA Office Renovation
Catholic Pastoral Center Rehabilitation
ABC - Office Build-Out
ETRC Howe Hall
Food Sciences Building - Room 2379 Renovation
Minnesota Farm Bureau Center
Home Office Building with Expansion
Dodge House Renovations
Memorial Union Food Court
Beardshear Hall Remodeling
Iowa Events Center
Corporate Headquarters Renovation
219 Eighth Street
Hub Tower Conference Center
Arizona Farm Bureau Center
Covered Walkway
Utah Farm Bureau Center
Hospital Emergency Room Renovation & Expansion
Reid “E” Research Facility
Goodnow Hall Restoration & Renovation
Office Renovation
Levitt Center for University Advancement
Parking Garage
VRAC C6 and Office Suite
Lance and Ellie's Sandwich Shop
Hub Tower Office Tenant Improvement
Coover Hall Infrastructure Study
New Office
Sabin Hall Renovation – LEED Gold
Kemin Food Sciences Lab Renovation
Executive Suites Renovation
College of Human Sciences
Extension 4-H Youth Building
Hub Tower Elevator Modernization
Corporate Headquarters
Iowa City Federal Building - VHA Renovations
Biological Sciences Facility
BBS at 219 8th Street
Camp Dodge Pool Campus Improvements
© 2024 BBS Architects | engineers, All rights reserved.