BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

ETRC Howe Hall
Utah Farm Bureau Center
New Facility
ETRC Hoover Hall
Chemistry Building Addition & Renovation
Hub Tower Office Tenant Improvement
Office Renovation
Biological Sciences Facility
Kemin Food Sciences Lab Renovation
Dodge House Renovations
Extension 4-H Youth Building
Reid “E” Research Facility
MacKay Hall Auditorium Renovation
Corporate Headquarters
Covered Walkway
LeBaron Hall Replacement Study
Minnesota Farm Bureau Center
Corporate Highrise
Levitt Center for University Advancement
Beardshear Hall Remodeling
Corporate Headquarters
Iowa Events Center
VRAC C6 and Office Suite
Arizona Farm Bureau Center
Sabin Hall Renovation – LEED Gold
Terminal
Corporate Headquarters Renovation
Goodnow Hall Restoration & Renovation
Coover Hall Infrastructure Study
College of Human Sciences
Home Office Building with Expansion
Parking Garage
219 Eighth Street
Catholic Pastoral Center Rehabilitation
Hospital Emergency Room Renovation & Expansion
Hub Tower Conference Center
Camp Dodge Pool Campus Improvements
New Office
Wyoming Farm Bureau Center
© 2019 BBS Architects | engineers, All rights reserved.