BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Corporate Highrise
Terminal
Minnesota Farm Bureau Center
Levitt Center for University Advancement
Beardshear Hall Remodeling
Hub Tower Office Tenant Improvement
VRAC C6 and Office Suite
Camp Dodge Pool Campus Improvements
Home Office Building with Expansion
MacKay Hall Auditorium Renovation
Hospital Emergency Room Renovation & Expansion
Sabin Hall Renovation – LEED Gold
Corporate Headquarters Renovation
College of Human Sciences
Office Renovation
Reid “E” Research Facility
New Facility
Dodge House Renovations
Corporate Headquarters
Covered Walkway
Wyoming Farm Bureau Center
Catholic Pastoral Center Rehabilitation
ETRC Hoover Hall
219 Eighth Street
Utah Farm Bureau Center
LeBaron Hall Replacement Study
ETRC Howe Hall
Parking Garage
Iowa Events Center
Kemin Food Sciences Lab Renovation
Hub Tower Conference Center
Arizona Farm Bureau Center
Goodnow Hall Restoration & Renovation
Corporate Headquarters
Biological Sciences Facility
Extension 4-H Youth Building
Chemistry Building Addition & Renovation
Coover Hall Infrastructure Study
New Office
© 2019 BBS Architects | engineers, All rights reserved.