BBS Architects Engineers

US Department of Veterans Affairs

VA - Covered Walkway
VA - Covered Walkway
VA - Covered Walkway
VA - Covered Walkway

Owner: U.S. Department of Veterans Affairs

Architectural and Engineering Design: BBS Architects | Engineers

Civil Engineering: Snyder and Associates, Inc.

Construction Completed: 2013

Project Cost: $665,000

The Pedestrian Walkway project involved creating a protected path of travel between two shuttle bus stops, one at long term patient care building and the other at the main hospital entry.

The open air walkway canopy system is comprised of precast concrete walls, exposed structural steel framework, steel window wind breaks, and a translucent canopy overhead. The canopy structure was designed to incorporate various visual elements of the surrounding buildings, while projecting a new 21st century image for the VA Campus.

While traversing a difficult site, the walkway seamlessly meets the VA Barrier Free Design requirements while creating a light filled travel path and breakout seating areas for staff and veteran use. BBS performed architectural and electrical engineering design services and coordination with the State Historic Preservation Office.

Lance and Ellie's Sandwich Shop
Wyoming Farm Bureau Center
Executive Suites Renovation
Corporate Headquarters
Union Drive Community Center Renovations
Dodge House Renovations
Iowa City Federal Building - VHA Renovations
Memorial Union Food Court
VRAC C6 and Office Suite
Hub Tower Elevator Modernization
Office Renovation
Beardshear Hall Remodeling
Hub Tower Office Tenant Improvement
ETRC Hoover Hall
Levitt Center for University Advancement
Catholic Pastoral Center Rehabilitation
Food Sciences Building - Room 2379 Renovation
Hub Tower Conference Center
IADA Office Renovation
Iowa Events Center
Minnesota Farm Bureau Center
Corporate Headquarters Renovation
Chemistry Building Addition & Renovation
Extension 4-H Youth Building
Reid “E” Research Facility
Camp Dodge Pool Campus Improvements
New Office
ABC - Office Build-Out
Kemin Food Sciences Lab Renovation
Utah Farm Bureau Center
College of Human Sciences
Sabin Hall Renovation – LEED Gold
Corporate Highrise
LeBaron Hall Replacement Study
Arizona Farm Bureau Center
MacKay Hall Auditorium Renovation
Hospital Emergency Room Renovation & Expansion
Terminal
Biological Sciences Facility
Science Center - New Facility
219 Eighth Street
Goodnow Hall Restoration & Renovation
ETRC Howe Hall
Home Office Building with Expansion
Parking Garage
Coover Hall Infrastructure Study
Des Moines Public Market
© 2023 BBS Architects | engineers, All rights reserved.