BBS Architects Engineers

Ames Lab

Owner: Us Department of Energy
Architectural and Engineering Design Services: BBS Architects | Engineers
General Contractor: N/A
Construction Completed: N/A
 

Client Need 
The objective of this project was to conduct an arc flash assessment of two buildings owned by the U.S. Department of Energy and operated by Iowa State University.  The condition and capacity of the existing electrical systems also required evaluation, including documentation of age and code deficiencies.  Arc Flash/Shock Hazard labels were provided on all switchboards, panelboards, and motor control centers.  The final report provided to the client included the discovered system deficiencies, floor plans identifying location of electrical equipment, one-line diagrams, and arc flash calculations.
BBS Approach
BBS electrical engineers began the analysis with a review of existing floor plans and one-line drawings supplied by Ames Lab.  A field survey was scheduled to update equipment locations and document transformer sizes, feeder breakers and equipment condition.  BBS then generated one-line drawings using SKM Powertools for Windows (PTW) software.  A second site survey was scheduled to remove panel covers during a building electrical system shutdown to identify feeder wire sizes and remaining overcurrent protection device settings and sizes.  During both site visits identified system deficiencies and code violations were documented, and photos were taken of all electrical equipment.
Project Results 
Following BBS’s surveys and inspections, the PTW model was updated with the verified data needed to complete the study.  Arc-Flash calculations were completed and 126 labels were installed to identify the specific hazards of working on each panel.  As part of the final report Ames Lab received accurate floor plans and one-line diagrams of their current electrical system for each building.  In addition to the updated documentation the client received a complete assessment of the existing condition and recommended corrective action for their electrical system.

Home Office Building with Expansion
New Office
Executive Suites Renovation
Extension 4-H Youth Building
Parking Garage
Biological Sciences Facility
Office Renovation
Federal Building Study and Arc Flash Assessment
VRAC C6 and Office Suite
Wyoming Farm Bureau Center
ABC - Office Build-Out
Minnesota Farm Bureau Center
Hub Tower Conference Center
Richard Bolling Federal Building Study and Arc Flash Assesment
Reid “E” Research Facility
Catholic Pastoral Center Rehabilitation
Hub Tower Office Tenant Improvement
219 Eighth Street
Corporate Highrise
IADA Office Renovation
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
Geoffroy Residence Hall
Terminal
College of Human Sciences
MacKay Hall Auditorium Renovation
Iowa Events Center
Union Drive Community Center Renovations
Iowa City Federal Building - VHA Renovations
Covered Walkway
Memorial Union Food Court
ETRC Hoover Hall
Hub Tower Elevator Modernization
Levitt Center for University Advancement
Corporate Headquarters Renovation
ETRC Howe Hall
Camp Dodge Pool Campus Improvements
Science Center - New Facility
Kemin Food Sciences Lab Renovation
Food Sciences Building - Room 2379 Renovation
Lance and Ellie's Sandwich Shop
Sabin Hall Renovation – LEED Gold
LeBaron Hall Replacement Study
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Hospital Emergency Room Renovation & Expansion
Dodge House Renovations
Coover Hall Infrastructure Study
Beardshear Hall Remodeling
Utah Farm Bureau Center
Chemistry Building Addition & Renovation
Arizona Farm Bureau Center
Camp Dodge Urban Assault Course
© 2022 BBS Architects | engineers, All rights reserved.