BBS Architects Engineers

Ames Lab

Owner: Us Department of Energy
Architectural and Engineering Design Services: BBS Architects | Engineers
General Contractor: N/A
Construction Completed: N/A
 

Client Need 
The objective of this project was to conduct an arc flash assessment of two buildings owned by the U.S. Department of Energy and operated by Iowa State University.  The condition and capacity of the existing electrical systems also required evaluation, including documentation of age and code deficiencies.  Arc Flash/Shock Hazard labels were provided on all switchboards, panelboards, and motor control centers.  The final report provided to the client included the discovered system deficiencies, floor plans identifying location of electrical equipment, one-line diagrams, and arc flash calculations.
BBS Approach
BBS electrical engineers began the analysis with a review of existing floor plans and one-line drawings supplied by Ames Lab.  A field survey was scheduled to update equipment locations and document transformer sizes, feeder breakers and equipment condition.  BBS then generated one-line drawings using SKM Powertools for Windows (PTW) software.  A second site survey was scheduled to remove panel covers during a building electrical system shutdown to identify feeder wire sizes and remaining overcurrent protection device settings and sizes.  During both site visits identified system deficiencies and code violations were documented, and photos were taken of all electrical equipment.
Project Results 
Following BBS’s surveys and inspections, the PTW model was updated with the verified data needed to complete the study.  Arc-Flash calculations were completed and 126 labels were installed to identify the specific hazards of working on each panel.  As part of the final report Ames Lab received accurate floor plans and one-line diagrams of their current electrical system for each building.  In addition to the updated documentation the client received a complete assessment of the existing condition and recommended corrective action for their electrical system.

ETRC Howe Hall
Hub Tower Elevator Modernization
Iowa Events Center
Reid “E” Research Facility
IADA Office Renovation
Biological Sciences Facility
MacKay Hall Auditorium Renovation
Union Drive Community Center Renovations
Levitt Center for University Advancement
Executive Suites Renovation
Wyoming Farm Bureau Center
Lance and Ellie's Sandwich Shop
Camp Dodge Urban Assault Course
Memorial Union Food Court
Covered Walkway
VRAC C6 and Office Suite
Kemin Food Sciences Lab Renovation
Extension 4-H Youth Building
ETRC Hoover Hall
Office Renovation
Minnesota Farm Bureau Center
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
Beardshear Hall Remodeling
Science Center - New Facility
Corporate Highrise
Chemistry Building Addition & Renovation
Hub Tower Conference Center
Corporate Headquarters Renovation
Dodge House Renovations
Camp Dodge Pool Campus Improvements
New Office
Hospital Emergency Room Renovation & Expansion
BBS at 219 8th Street
Richard Bolling Federal Building Study and Arc Flash Assesment
Arizona Farm Bureau Center
Home Office Building with Expansion
Sabin Hall Renovation – LEED Gold
Coover Hall Infrastructure Study
Hub Tower Office Tenant Improvement
Catholic Pastoral Center Rehabilitation
College of Human Sciences
LeBaron Hall Replacement Study
Federal Building Study and Arc Flash Assessment
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Iowa City Federal Building - VHA Renovations
Camp Dodge Chapel Addition and Renovation
Parking Garage
ABC - Office Build-Out
Utah Farm Bureau Center
Terminal
Food Sciences Building - Room 2379 Renovation
219 Eighth Street
Geoffroy Residence Hall
© 2025 BBS Architects | engineers, All rights reserved.