Ames National Laboratory

Owner: US Department of Energy
Architectural and Engineering Design Services:  BBS Architects | Engineers
General Contractor: N/A
 

Client Need 
Ames Laboratory required a study to evaluate the condition of the electrical systems in Wilhelm Hall and Metals Development, two buildings located on the campus of Iowa State University.  The existing electrical infrastructure in both buildings was well maintained, however, replacement and upgrades were required due to age, condition, or location. Ames Laboratory required assistance with development of a Capital Improvement Plan (CIP) to modernize the equipment.
Approach 
BBS electrical engineers began the process with existing building drawings and one-line drawings to identify key pieces of equipment to be surveyed and inspected as part of the study.  Building walkthroughs and meetings with facility electricians were completed to update existing documentation. Key electrical infrastructure, including 5kV switches and data center UPS’s, were examined and documented. Building power outages were scheduled to allow BBS engineers to document internal panel conditions and record key information from overcurrent protective devices. 
Solution 
Following BBS’s surveys, inspections, and investigations, the existing floor plan and one-line diagrams were updated.  The deficiencies were recorded and the construction of a computer-generated model of the electrical system was completed. Arc-Flash calculations were completed and labels installed to identify hazards on existing equipment.  To conclude the study, a CIP was generated to correct the identified deficiencies and modernize outdated equipment. An initial statement of probable cost associated with the design and implementation of the recommendations was included in the CIP.

Home Office Building with Expansion
Hub Tower Office Tenant Improvement
Camp Dodge Pool Campus Improvements
Covered Walkway
Chemistry Building Addition & Renovation
Iowa City Federal Building - VHA Renovations
Sabin Hall Renovation – LEED Gold
Levitt Center for University Advancement
BBS at 219 8th Street
Camp Dodge Urban Assault Course
Corporate Headquarters Renovation
Biological Sciences Facility
LeBaron Hall Replacement Study
Catholic Pastoral Center Rehabilitation
Corporate Highrise
Office Renovation
Arizona Farm Bureau Center
Global Neighbors
Beardshear Hall Remodeling
Federal Building Study and Arc Flash Assessment
Moulton Performing & Visual Arts Signature School
Memorial Union Food Court
Union Drive Community Center Renovations
Kemin Food Sciences Lab Renovation
MacKay Hall Auditorium Renovation
Utah Farm Bureau Center
Camp Dodge Chapel Addition and Renovation
New Office
Wyoming Farm Bureau Center
Parking Garage
ETRC Hoover Hall
Extension 4-H Youth Building
ETRC Howe Hall
Richard Bolling Federal Building Study and Arc Flash Assesment
Dodge House Renovations
Hospital Emergency Room Renovation & Expansion
Terminal
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Lance and Ellie's Sandwich Shop
Minnesota Farm Bureau Center
Monroe Elementary School Improvements
Science Center - New Facility
College of Human Sciences
Lincoln High School Improvements
VRAC C6 and Office Suite
Theodore Roosevelt High School Natatorium Improvements
ABC - Office Build-Out
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Hub Tower Conference Center
Geoffroy Residence Hall
Coover Hall Infrastructure Study
Administration Building Renovation and Addition
Iowa Events Center
Food Sciences Building - Room 2379 Renovation
Executive Suites Renovation
Reid “E” Research Facility
Beardshear Hall Office Renovation
219 Eighth Street
IADA Office Renovation
© 2026 BBS Architects | engineers, All rights reserved.