Ames Lab

Owner: US Department of Energy
Architectural and Engineering Design Services:  BBS Architects | Engineers
General Contractor: N/A
 

Client Need 
Ames Laboratory required a study to evaluate the condition of the electrical systems in Wilhelm Hall and Metals Development, two buildings located on the campus of Iowa State University.  The existing electrical infrastructure in both buildings was well maintained, however, replacement and upgrades were required due to age, condition, or location. Ames Laboratory required assistance with development of a Capital Improvement Plan (CIP) to modernize the equipment.
Approach 
BBS electrical engineers began the process with existing building drawings and one-line drawings to identify key pieces of equipment to be surveyed and inspected as part of the study.  Building walkthroughs and meetings with facility electricians were completed to update existing documentation. Key electrical infrastructure, including 5kV switches and data center UPS’s, were examined and documented. Building power outages were scheduled to allow BBS engineers to document internal panel conditions and record key information from overcurrent protective devices. 
Solution 
Following BBS’s surveys, inspections, and investigations, the existing floor plan and one-line diagrams were updated.  The deficiencies were recorded and the construction of a computer-generated model of the electrical system was completed. Arc-Flash calculations were completed and labels installed to identify hazards on existing equipment.  To conclude the study, a CIP was generated to correct the identified deficiencies and modernize outdated equipment. An initial statement of probable cost associated with the design and implementation of the recommendations was included in the CIP.

College of Human Sciences
MacKay Hall Auditorium Renovation
Corporate Highrise
Corporate Headquarters Renovation
Hospital Emergency Room Renovation & Expansion
BBS at 219 8th Street
Sabin Hall Renovation – LEED Gold
Parking Garage
Food Sciences Building - Room 2379 Renovation
ABC - Office Build-Out
Beardshear Hall Remodeling
Iowa Events Center
Biological Sciences Facility
Camp Dodge Pool Campus Improvements
Arizona Farm Bureau Center
Hub Tower Office Tenant Improvement
Dodge House Renovations
Lance and Ellie's Sandwich Shop
Office Renovation
Camp Dodge Chapel Addition and Renovation
Richard Bolling Federal Building Study and Arc Flash Assesment
Iowa City Federal Building - VHA Renovations
Covered Walkway
Kemin Food Sciences Lab Renovation
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Home Office Building with Expansion
Federal Building Study and Arc Flash Assessment
Catholic Pastoral Center Rehabilitation
IADA Office Renovation
New Office
Levitt Center for University Advancement
VRAC C6 and Office Suite
Science Center - New Facility
Extension 4-H Youth Building
Utah Farm Bureau Center
ETRC Howe Hall
Union Drive Community Center Renovations
Geoffroy Residence Hall
ETRC Hoover Hall
Minnesota Farm Bureau Center
Chemistry Building Addition & Renovation
Memorial Union Food Court
Ames Laboratory TASF and Spedding Hall Arc Flash Study
219 Eighth Street
Hub Tower Conference Center
Reid “E” Research Facility
Coover Hall Infrastructure Study
Wyoming Farm Bureau Center
Terminal
Hub Tower Elevator Modernization
Camp Dodge Urban Assault Course
LeBaron Hall Replacement Study
Executive Suites Renovation
© 2025 BBS Architects | engineers, All rights reserved.