Client Need 
Ames Laboratory required a study to evaluate the condition of the electrical systems in Wilhelm Hall and Metals Development, two buildings located on the campus of Iowa State University.  The existing electrical infrastructure in both buildings was well maintained, however, replacement and upgrades were required due to age, condition, or location. Ames Laboratory required assistance with development of a Capital Improvement Plan (CIP) to modernize the equipment.
Approach 
BBS electrical engineers began the process with existing building drawings and one-line drawings to identify key pieces of equipment to be surveyed and inspected as part of the study.  Building walkthroughs and meetings with facility electricians were completed to update existing documentation. Key electrical infrastructure, including 5kV switches and data center UPS’s, were examined and documented. Building power outages were scheduled to allow BBS engineers to document internal panel conditions and record key information from overcurrent protective devices. 
Solution 
Following BBS’s surveys, inspections, and investigations, the existing floor plan and one-line diagrams were updated.  The deficiencies were recorded and the construction of a computer-generated model of the electrical system was completed. Arc-Flash calculations were completed and labels installed to identify hazards on existing equipment.  To conclude the study, a CIP was generated to correct the identified deficiencies and modernize outdated equipment. An initial statement of probable cost associated with the design and implementation of the recommendations was included in the CIP.

Catholic Pastoral Center Rehabilitation
Home Office Building with Expansion
Parking Garage
Hub Tower Conference Center
Camp Dodge Chapel Addition and Renovation
Geoffroy Residence Hall
Theodore Roosevelt High School Natatorium Improvements
Camp Dodge Urban Assault Course
Camp Dodge Pool Campus Improvements
MacKay Hall Auditorium Renovation
Science Center - New Facility
Dodge House Renovations
BBS at 219 8th Street
Iowa City Federal Building - VHA Renovations
Executive Suites Renovation
Office Renovation
Monroe Elementary School Improvements
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
ETRC Hoover Hall
Extension 4-H Youth Building
Federal Building Study and Arc Flash Assessment
Chemistry Building Addition & Renovation
LeBaron Hall Replacement Study
New Office
IADA Office Renovation
Wyoming Farm Bureau Center
Covered Walkway
Global Neighbors
VRAC C6 and Office Suite
Terminal
Moulton Performing & Visual Arts Signature School
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Lincoln High School Improvements
Beardshear Hall Remodeling
219 Eighth Street
Food Sciences Building - Room 2379 Renovation
Hub Tower Office Tenant Improvement
Arizona Farm Bureau Center
Utah Farm Bureau Center
Hospital Emergency Room Renovation & Expansion
Union Drive Community Center Renovations
ABC - Office Build-Out
Administration Building Renovation and Addition
Levitt Center for University Advancement
Beardshear Hall Office Renovation
Lance and Ellie's Sandwich Shop
Corporate Headquarters Renovation
College of Human Sciences
Corporate Highrise
Sabin Hall Renovation – LEED Gold
Biological Sciences Facility
ETRC Howe Hall
Coover Hall Infrastructure Study
Richard Bolling Federal Building Study and Arc Flash Assesment
Kemin Food Sciences Lab Renovation
Iowa Events Center
Memorial Union Food Court
Minnesota Farm Bureau Center
Reid “E” Research Facility
© 2026 BBS Architects | engineers, All rights reserved.