Ames Lab

Owner: US Department of Energy
Architectural and Engineering Design Services:  BBS Architects | Engineers
General Contractor: N/A
 

Client Need 
Ames Laboratory required a study to evaluate the condition of the electrical systems in Wilhelm Hall and Metals Development, two buildings located on the campus of Iowa State University.  The existing electrical infrastructure in both buildings was well maintained, however, replacement and upgrades were required due to age, condition, or location. Ames Laboratory required assistance with development of a Capital Improvement Plan (CIP) to modernize the equipment.
Approach 
BBS electrical engineers began the process with existing building drawings and one-line drawings to identify key pieces of equipment to be surveyed and inspected as part of the study.  Building walkthroughs and meetings with facility electricians were completed to update existing documentation. Key electrical infrastructure, including 5kV switches and data center UPS’s, were examined and documented. Building power outages were scheduled to allow BBS engineers to document internal panel conditions and record key information from overcurrent protective devices. 
Solution 
Following BBS’s surveys, inspections, and investigations, the existing floor plan and one-line diagrams were updated.  The deficiencies were recorded and the construction of a computer-generated model of the electrical system was completed. Arc-Flash calculations were completed and labels installed to identify hazards on existing equipment.  To conclude the study, a CIP was generated to correct the identified deficiencies and modernize outdated equipment. An initial statement of probable cost associated with the design and implementation of the recommendations was included in the CIP.

Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Corporate Highrise
MacKay Hall Auditorium Renovation
Dodge House Renovations
Biological Sciences Facility
Arizona Farm Bureau Center
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Union Drive Community Center Renovations
Food Sciences Building - Room 2379 Renovation
Parking Garage
ETRC Howe Hall
Iowa City Federal Building - VHA Renovations
Hub Tower Office Tenant Improvement
VRAC C6 and Office Suite
Iowa Events Center
219 Eighth Street
New Office
Home Office Building with Expansion
Terminal
Reid “E” Research Facility
Hub Tower Elevator Modernization
Covered Walkway
Science Center - New Facility
Beardshear Hall Remodeling
Extension 4-H Youth Building
Corporate Headquarters Renovation
Coover Hall Infrastructure Study
Memorial Union Food Court
Hub Tower Conference Center
LeBaron Hall Replacement Study
BBS at 219 8th Street
Chemistry Building Addition & Renovation
Camp Dodge Pool Campus Improvements
Wyoming Farm Bureau Center
Minnesota Farm Bureau Center
Federal Building Study and Arc Flash Assessment
Executive Suites Renovation
Richard Bolling Federal Building Study and Arc Flash Assesment
College of Human Sciences
Office Renovation
IADA Office Renovation
Lance and Ellie's Sandwich Shop
Camp Dodge Urban Assault Course
Catholic Pastoral Center Rehabilitation
Utah Farm Bureau Center
Kemin Food Sciences Lab Renovation
Geoffroy Residence Hall
Hospital Emergency Room Renovation & Expansion
Camp Dodge Chapel Addition and Renovation
ABC - Office Build-Out
Sabin Hall Renovation – LEED Gold
Levitt Center for University Advancement
ETRC Hoover Hall
© 2024 BBS Architects | engineers, All rights reserved.