Client Need 
Ames Laboratory required a study to evaluate the condition of the electrical systems in Wilhelm Hall and Metals Development, two buildings located on the campus of Iowa State University.  The existing electrical infrastructure in both buildings was well maintained, however, replacement and upgrades were required due to age, condition, or location. Ames Laboratory required assistance with development of a Capital Improvement Plan (CIP) to modernize the equipment.
Approach 
BBS electrical engineers began the process with existing building drawings and one-line drawings to identify key pieces of equipment to be surveyed and inspected as part of the study.  Building walkthroughs and meetings with facility electricians were completed to update existing documentation. Key electrical infrastructure, including 5kV switches and data center UPS’s, were examined and documented. Building power outages were scheduled to allow BBS engineers to document internal panel conditions and record key information from overcurrent protective devices. 
Solution 
Following BBS’s surveys, inspections, and investigations, the existing floor plan and one-line diagrams were updated.  The deficiencies were recorded and the construction of a computer-generated model of the electrical system was completed. Arc-Flash calculations were completed and labels installed to identify hazards on existing equipment.  To conclude the study, a CIP was generated to correct the identified deficiencies and modernize outdated equipment. An initial statement of probable cost associated with the design and implementation of the recommendations was included in the CIP.

Camp Dodge Chapel Addition and Renovation
Hospital Emergency Room Renovation & Expansion
BBS at 219 8th Street
Food Sciences Building - Room 2379 Renovation
Iowa City Federal Building - VHA Renovations
Iowa Events Center
Camp Dodge Pool Campus Improvements
Levitt Center for University Advancement
Corporate Headquarters Renovation
Office Renovation
Extension 4-H Youth Building
VRAC C6 and Office Suite
Arizona Farm Bureau Center
Hub Tower Elevator Modernization
Hub Tower Office Tenant Improvement
ETRC Hoover Hall
219 Eighth Street
Hub Tower Conference Center
Memorial Union Food Court
Reid “E” Research Facility
Sabin Hall Renovation – LEED Gold
New Office
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Catholic Pastoral Center Rehabilitation
IADA Office Renovation
Home Office Building with Expansion
Geoffroy Residence Hall
Federal Building Study and Arc Flash Assessment
Minnesota Farm Bureau Center
Biological Sciences Facility
Camp Dodge Urban Assault Course
Covered Walkway
Science Center - New Facility
Coover Hall Infrastructure Study
MacKay Hall Auditorium Renovation
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Terminal
Parking Garage
Executive Suites Renovation
Beardshear Hall Remodeling
College of Human Sciences
Chemistry Building Addition & Renovation
Wyoming Farm Bureau Center
Dodge House Renovations
LeBaron Hall Replacement Study
Richard Bolling Federal Building Study and Arc Flash Assesment
Kemin Food Sciences Lab Renovation
ETRC Howe Hall
Lance and Ellie's Sandwich Shop
Corporate Highrise
Utah Farm Bureau Center
ABC - Office Build-Out
Union Drive Community Center Renovations
© 2023 BBS Architects | engineers, All rights reserved.