BBS Architects Engineers

Ames Lab

Owner: US Department of Energy
Architectural and Engineering Design Services:  BBS Architects | Engineers
General Contractor: N/A
 

Client Need 
Ames Laboratory required a study to evaluate the condition of the electrical systems in Wilhelm Hall and Metals Development, two buildings located on the campus of Iowa State University.  The existing electrical infrastructure in both buildings was well maintained, however, replacement and upgrades were required due to age, condition, or location. Ames Laboratory required assistance with development of a Capital Improvement Plan (CIP) to modernize the equipment.
Approach 
BBS electrical engineers began the process with existing building drawings and one-line drawings to identify key pieces of equipment to be surveyed and inspected as part of the study.  Building walkthroughs and meetings with facility electricians were completed to update existing documentation. Key electrical infrastructure, including 5kV switches and data center UPS’s, were examined and documented. Building power outages were scheduled to allow BBS engineers to document internal panel conditions and record key information from overcurrent protective devices. 
Solution 
Following BBS’s surveys, inspections, and investigations, the existing floor plan and one-line diagrams were updated.  The deficiencies were recorded and the construction of a computer-generated model of the electrical system was completed. Arc-Flash calculations were completed and labels installed to identify hazards on existing equipment.  To conclude the study, a CIP was generated to correct the identified deficiencies and modernize outdated equipment. An initial statement of probable cost associated with the design and implementation of the recommendations was included in the CIP.

Levitt Center for University Advancement
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Union Drive Community Center Renovations
VRAC C6 and Office Suite
Iowa Events Center
Camp Dodge Chapel Addition and Renovation
Parking Garage
Catholic Pastoral Center Rehabilitation
Biological Sciences Facility
Geoffroy Residence Hall
Richard Bolling Federal Building Study and Arc Flash Assesment
Wyoming Farm Bureau Center
New Office
Beardshear Hall Remodeling
219 Eighth Street
Hub Tower Conference Center
Food Sciences Building - Room 2379 Renovation
Chemistry Building Addition & Renovation
BBS at 219 8th Street
Lance and Ellie's Sandwich Shop
ETRC Howe Hall
Home Office Building with Expansion
MacKay Hall Auditorium Renovation
Iowa City Federal Building - VHA Renovations
Camp Dodge Pool Campus Improvements
IADA Office Renovation
Utah Farm Bureau Center
Extension 4-H Youth Building
Federal Building Study and Arc Flash Assessment
Science Center - New Facility
Hospital Emergency Room Renovation & Expansion
Executive Suites Renovation
Kemin Food Sciences Lab Renovation
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Terminal
Reid “E” Research Facility
Memorial Union Food Court
Hub Tower Office Tenant Improvement
Corporate Highrise
LeBaron Hall Replacement Study
ETRC Hoover Hall
Office Renovation
Dodge House Renovations
ABC - Office Build-Out
Hub Tower Elevator Modernization
College of Human Sciences
Camp Dodge Urban Assault Course
Covered Walkway
Minnesota Farm Bureau Center
Corporate Headquarters Renovation
Coover Hall Infrastructure Study
Sabin Hall Renovation – LEED Gold
Arizona Farm Bureau Center
© 2024 BBS Architects | engineers, All rights reserved.