BBS Architects Engineers

BBS Architects Engineers Office

Owner: BBS Architects | Engineers

Architectural and Engineering Design Services: BBS Architects | Engineers

General Contractor: Neumann Brothers, Inc.

Construction Completed: 2017

Project Data: 6,130 sf

 

Client Need: After 10 years we decided we needed an upgrade in our office to better represent our working style and current staff. The centralized core divided the engineering department and architectural department making it difficult for collaboration; the tinted single pane windows allowed little light into the space while offering no insulation. Several small meeting spaces were set up for collaborative meetings but were rarely used. 

BBS Approach: The tenant space on ground level of 219 offered a naturally lit space with high ceilings and an open floor plan. By consolidating our past meeting areas into one private conference room and one open multi-use space we were able to move from a larger floor plan to a smaller one. The engineering and architectural departments are connected in an open office layout making interoffice collaboration easier. The Materials Library is organized in several shelves with an open table for layout space and material boards. Tack-able wall space allows a space for displaying finished work, sketches, process drawings and photos, or material boards. 

Project Results:

  • Connectivity between architects and engineers
  • Street Presence
  • Multi-use open collaboration meeting areas
  • Natural lighting
  • Efficient and well lit library and layout space
Hospital Emergency Room Renovation & Expansion
Catholic Pastoral Center Rehabilitation
Dodge House Renovations
Federal Building Study and Arc Flash Assessment
Science Center - New Facility
Biological Sciences Facility
Kemin Food Sciences Lab Renovation
ETRC Hoover Hall
Arizona Farm Bureau Center
Covered Walkway
Iowa City Federal Building - VHA Renovations
Camp Dodge Pool Campus Improvements
Office Renovation
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
LeBaron Hall Replacement Study
Richard Bolling Federal Building Study and Arc Flash Assesment
Minnesota Farm Bureau Center
Hub Tower Office Tenant Improvement
College of Human Sciences
Memorial Union Food Court
Hub Tower Conference Center
Home Office Building with Expansion
ABC - Office Build-Out
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
Terminal
Parking Garage
Camp Dodge Urban Assault Course
Executive Suites Renovation
Beardshear Hall Office Renovation
Administration Building Renovation and Addition
Lincoln High School Improvements
VRAC C6 and Office Suite
ETRC Howe Hall
Levitt Center for University Advancement
Geoffroy Residence Hall
Global Neighbors
Corporate Headquarters Renovation
Monroe Elementary School Improvements
IADA Office Renovation
219 Eighth Street
Camp Dodge Chapel Addition and Renovation
Beardshear Hall Remodeling
MacKay Hall Auditorium Renovation
Iowa Events Center
Reid “E” Research Facility
Extension 4-H Youth Building
Food Sciences Building - Room 2379 Renovation
Wyoming Farm Bureau Center
Utah Farm Bureau Center
Union Drive Community Center Renovations
Coover Hall Infrastructure Study
Theodore Roosevelt High School Natatorium Improvements
Corporate Highrise
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Moulton Performing & Visual Arts Signature School
Lance and Ellie's Sandwich Shop
Sabin Hall Renovation – LEED Gold
Chemistry Building Addition & Renovation
New Office
© 2026 BBS Architects | engineers, All rights reserved.