BBS Architects Engineers

EMC Insurance Companies

EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise

Owner: EMC Insurance Companies
Architectural and Engineering Design Services: BBS Architects | Engineers
Construction Completed: 1997
Project Data: 430,000 SF
Construction Cost: $53,000,000

Client Need:
EMC expanded their downtown Des Moines location by adding this corporate high-rise adjacent to their existing headquarters building. They sought to achieve a bold and sophisticated image through the building design.

BBS Approach:
The sculptural expression was developed to take advantage of the building’s location within the skyline. Viewed from the west, the angled roof acts to counter the gradual decline of heights from north to south along the downtown skyline. Viewed from the south, the higher tower face establishes a strong figural identity for the EMC complex.

Project Results:

  • 430,000 SF expansion
  • 20-story office tower plus three-story support facility
  • Addition of three new skywalks
  • Two-level underground parking facility
  • Sophisticated cladding technology
  • Cutting-edge mechanical/electrical system
  • Advanced energy-conservation design:
    • Thermal storage
    • Low temperature air distribution
    • High-efficiency (R-7) windows

Industry Recognition:

  • When constructed, the EMC tower was the largest US installation of innovative “rainscreen” system
  • Awarded First Place in regional technology by the American Society of Refrigerating and Air Conditioning Engineers (ASHRAE)
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
ETRC Hoover Hall
Camp Dodge Pool Campus Improvements
Kemin Food Sciences Lab Renovation
Camp Dodge Chapel Addition and Renovation
Biological Sciences Facility
New Office
Covered Walkway
Catholic Pastoral Center Rehabilitation
Science Center - New Facility
Corporate Headquarters Renovation
Dodge House Renovations
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Theodore Roosevelt High School Natatorium Improvements
Minnesota Farm Bureau Center
BBS at 219 8th Street
Utah Farm Bureau Center
Wyoming Farm Bureau Center
IADA Office Renovation
Global Neighbors
219 Eighth Street
Office Renovation
Extension 4-H Youth Building
Reid “E” Research Facility
Memorial Union Food Court
ETRC Howe Hall
Hospital Emergency Room Renovation & Expansion
Richard Bolling Federal Building Study and Arc Flash Assesment
Administration Building Renovation and Addition
College of Human Sciences
Coover Hall Infrastructure Study
Lance and Ellie's Sandwich Shop
Home Office Building with Expansion
Parking Garage
Food Sciences Building - Room 2379 Renovation
Levitt Center for University Advancement
Monroe Elementary School Improvements
Executive Suites Renovation
Lincoln High School Improvements
Iowa Events Center
Iowa City Federal Building - VHA Renovations
Geoffroy Residence Hall
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Federal Building Study and Arc Flash Assessment
Union Drive Community Center Renovations
Hub Tower Conference Center
LeBaron Hall Replacement Study
ABC - Office Build-Out
Sabin Hall Renovation – LEED Gold
Camp Dodge Urban Assault Course
Terminal
Beardshear Hall Remodeling
MacKay Hall Auditorium Renovation
Beardshear Hall Office Renovation
Arizona Farm Bureau Center
Chemistry Building Addition & Renovation
Moulton Performing & Visual Arts Signature School
VRAC C6 and Office Suite
Hub Tower Office Tenant Improvement
© 2026 BBS Architects | engineers, All rights reserved.