BBS Architects Engineers

EMC Insurance Companies

EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise

Owner: EMC Insurance Companies
Architectural and Engineering Design Services: BBS Architects | Engineers
Construction Completed: 1997
Project Data: 430,000 SF
Construction Cost: $53,000,000

Client Need:
EMC expanded their downtown Des Moines location by adding this corporate high-rise adjacent to their existing headquarters building. They sought to achieve a bold and sophisticated image through the building design.

BBS Approach:
The sculptural expression was developed to take advantage of the building’s location within the skyline. Viewed from the west, the angled roof acts to counter the gradual decline of heights from north to south along the downtown skyline. Viewed from the south, the higher tower face establishes a strong figural identity for the EMC complex.

Project Results:

  • 430,000 SF expansion
  • 20-story office tower plus three-story support facility
  • Addition of three new skywalks
  • Two-level underground parking facility
  • Sophisticated cladding technology
  • Cutting-edge mechanical/electrical system
  • Advanced energy-conservation design:
    • Thermal storage
    • Low temperature air distribution
    • High-efficiency (R-7) windows

Industry Recognition:

  • When constructed, the EMC tower was the largest US installation of innovative “rainscreen” system
  • Awarded First Place in regional technology by the American Society of Refrigerating and Air Conditioning Engineers (ASHRAE)
Levitt Center for University Advancement
219 Eighth Street
College of Human Sciences
IADA Office Renovation
Home Office Building with Expansion
Minnesota Farm Bureau Center
MacKay Hall Auditorium Renovation
Reid “E” Research Facility
Camp Dodge Urban Assault Course
Arizona Farm Bureau Center
Hub Tower Office Tenant Improvement
Coover Hall Infrastructure Study
Dodge House Renovations
Chemistry Building Addition & Renovation
Geoffroy Residence Hall
ETRC Howe Hall
Corporate Headquarters Renovation
Catholic Pastoral Center Rehabilitation
Covered Walkway
Sabin Hall Renovation – LEED Gold
Parking Garage
ABC - Office Build-Out
Beardshear Hall Remodeling
Extension 4-H Youth Building
Utah Farm Bureau Center
Food Sciences Building - Room 2379 Renovation
Biological Sciences Facility
Kemin Food Sciences Lab Renovation
Memorial Union Food Court
VRAC C6 and Office Suite
Lance and Ellie's Sandwich Shop
Executive Suites Renovation
Hub Tower Conference Center
Terminal
New Office
Hospital Emergency Room Renovation & Expansion
New Facility
Wyoming Farm Bureau Center
Office Renovation
LeBaron Hall Replacement Study
Iowa City Federal Building - VHA Renovations
ETRC Hoover Hall
Camp Dodge Pool Campus Improvements
Iowa Events Center
© 2021 BBS Architects | engineers, All rights reserved.