BBS Architects Engineers

EMC Insurance Companies

EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise

Owner: EMC Insurance Companies
Architectural and Engineering Design Services: BBS Architects | Engineers
Construction Completed: 1997
Project Data: 430,000 SF
Construction Cost: $53,000,000

Client Need:
EMC expanded their downtown Des Moines location by adding this corporate high-rise adjacent to their existing headquarters building. They sought to achieve a bold and sophisticated image through the building design.

BBS Approach:
The sculptural expression was developed to take advantage of the building’s location within the skyline. Viewed from the west, the angled roof acts to counter the gradual decline of heights from north to south along the downtown skyline. Viewed from the south, the higher tower face establishes a strong figural identity for the EMC complex.

Project Results:

  • 430,000 SF expansion
  • 20-story office tower plus three-story support facility
  • Addition of three new skywalks
  • Two-level underground parking facility
  • Sophisticated cladding technology
  • Cutting-edge mechanical/electrical system
  • Advanced energy-conservation design:
    • Thermal storage
    • Low temperature air distribution
    • High-efficiency (R-7) windows

Industry Recognition:

  • When constructed, the EMC tower was the largest US installation of innovative “rainscreen” system
  • Awarded First Place in regional technology by the American Society of Refrigerating and Air Conditioning Engineers (ASHRAE)
Catholic Pastoral Center Rehabilitation
Iowa Events Center
ETRC Hoover Hall
Federal Building Study and Arc Flash Assessment
Biological Sciences Facility
Minnesota Farm Bureau Center
Hub Tower Office Tenant Improvement
Parking Garage
Covered Walkway
Arizona Farm Bureau Center
Beardshear Hall Remodeling
LeBaron Hall Replacement Study
VRAC C6 and Office Suite
Geoffroy Residence Hall
219 Eighth Street
Extension 4-H Youth Building
Sabin Hall Renovation – LEED Gold
Science Center - New Facility
Food Sciences Building - Room 2379 Renovation
Memorial Union Food Court
Reid “E” Research Facility
Hub Tower Elevator Modernization
Lance and Ellie's Sandwich Shop
Corporate Headquarters Renovation
Home Office Building with Expansion
Office Renovation
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Hub Tower Conference Center
Coover Hall Infrastructure Study
Camp Dodge Urban Assault Course
Camp Dodge Pool Campus Improvements
Wyoming Farm Bureau Center
Hospital Emergency Room Renovation & Expansion
Ames Laboratory TASF and Spedding Hall Arc Flash Study
MacKay Hall Auditorium Renovation
Executive Suites Renovation
ABC - Office Build-Out
New Office
Levitt Center for University Advancement
Union Drive Community Center Renovations
Richard Bolling Federal Building Study and Arc Flash Assesment
College of Human Sciences
Utah Farm Bureau Center
Terminal
IADA Office Renovation
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
Dodge House Renovations
Chemistry Building Addition & Renovation
Iowa City Federal Building - VHA Renovations
Kemin Food Sciences Lab Renovation
ETRC Howe Hall
© 2022 BBS Architects | engineers, All rights reserved.