BBS Architects Engineers

Des Moines Airport

Des Moines Airport Terminal
Des Moines Airport Terminal

Owner: Des Moines Airport Authority

Project Data: 33,000 SF

Construction Cost:

Lower Level and 2nd Floor - $500,000

Terminal Lobby - $2,000,000

Construction Completed: 2011

Passenger wayfinding and operational efficiencies were improved with common use passenger processing system (CUPPS). New terrazzo flooring and undulating ceiling accents feature splashes of color and patterns enhancing wayfinding from the ticketing lobby to the concourses and from the concourses to baggage claim and ground transportation areas. The new architectural finishes in the concourses coordinate and compliment the aesthetics previously established in security checkpoint areas.

All construction activities were organized in phases and scheduled at night to facilitate continuous operations throughout the project’s duration.

Minnesota Farm Bureau Center
Kemin Food Sciences Lab Renovation
ETRC Hoover Hall
Iowa Events Center
219 Eighth Street
Parking Garage
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
Lance and Ellie's Sandwich Shop
Biological Sciences Facility
Executive Suites Renovation
Camp Dodge Pool Campus Improvements
Hub Tower Elevator Modernization
Beardshear Hall Remodeling
New Facility
Memorial Union Food Court
VRAC C6 and Office Suite
Camp Dodge Urban Assault Course
Sabin Hall Renovation – LEED Gold
Chemistry Building Addition & Renovation
Federal Building Study and Arc Flash Assessment
Extension 4-H Youth Building
Food Sciences Building - Room 2379 Renovation
Office Renovation
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Union Drive Community Center Renovations
Catholic Pastoral Center Rehabilitation
New Office
Covered Walkway
Geoffroy Residence Hall
Richard Bolling Federal Building Study and Arc Flash Assesment
Hub Tower Conference Center
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Wyoming Farm Bureau Center
Hub Tower Office Tenant Improvement
Corporate Highrise
Coover Hall Infrastructure Study
LeBaron Hall Replacement Study
IADA Office Renovation
Hospital Emergency Room Renovation & Expansion
ETRC Howe Hall
Home Office Building with Expansion
ABC - Office Build-Out
Corporate Headquarters Renovation
Levitt Center for University Advancement
Iowa City Federal Building - VHA Renovations
Reid “E” Research Facility
Utah Farm Bureau Center
Dodge House Renovations
Arizona Farm Bureau Center
College of Human Sciences
MacKay Hall Auditorium Renovation
© 2022 BBS Architects | engineers, All rights reserved.