BBS Architects Engineers

DuPont Pioneer, Inc.

Reid “E” Research Facility
Reid “E” Research Facility
Reid “E” Research Facility
Reid “E” Research Facility

Project Data: 132,000 SF
Construction Completed: May 1999
Construction Cost: $17,500,000

This 132,000 SF facility is the latest addition to Pioneer Hi-Bred International, Inc.’s Johnston, Iowa research campus. Designed to meet the client’s expansion needs through the year 2005, the building houses 24 laboratories, support spaces, and office space for both the research community, as well as for the company’s general population. In addition, 5,000 SF of insect rearing operations are accommodated in a lower level basement.

The 132,000 SF, three-story facility is composed of two distinct wings. One wing contains the laboratories and their support spaces along with office space for researchers working in the new labs. The other wing contains office support functions for the entire building, additional research community offices, and general non-research related office expansion. A three-story open “Commons” containing bridges between the two wings and a dramatic cantilevered stair, acts as a general gathering space where scientists meet and interact outside of the laboratory environment.

Drawing upon the model of the client’s highly successful existing laboratories and open office plan buildings, the structure is connected to the rest of the campus by on-grade concourse links to create an enclosed, landscaped courtyard with other existing buildings. Composed from a palette of brick masonry and aluminum curtainwall, the resulting exterior expression is a blend of building elements used previously on the campus with the intent to unify several recent building projects.

Executed as a “fast-track” project, the building’s construction was begun only four months after the beginning of the design process. BBS Architects | Engineers worked very closely with the Owner and members of the construction team in order to achieve this goal, and to help complete the $17.5 million project within the required one year construction period.

MacKay Hall Auditorium Renovation
Lance and Ellie's Sandwich Shop
219 Eighth Street
New Facility
Terminal
Hub Tower Conference Center
Kemin Food Sciences Lab Renovation
Corporate Highrise
Home Office Building with Expansion
Iowa Events Center
Dodge House Renovations
Extension 4-H Youth Building
IADA Office Renovation
Catholic Pastoral Center Rehabilitation
Geoffroy Residence Hall
Food Sciences Building - Room 2379 Renovation
College of Human Sciences
Camp Dodge Urban Assault Course
Corporate Headquarters
Hub Tower Office Tenant Improvement
ETRC Hoover Hall
Biological Sciences Facility
ETRC Howe Hall
Memorial Union Food Court
Camp Dodge Pool Campus Improvements
Sabin Hall Renovation – LEED Gold
LeBaron Hall Replacement Study
Arizona Farm Bureau Center
Hospital Emergency Room Renovation & Expansion
Utah Farm Bureau Center
Executive Suites Renovation
Iowa City Federal Building - VHA Renovations
Office Renovation
Beardshear Hall Remodeling
Coover Hall Infrastructure Study
Chemistry Building Addition & Renovation
New Office
VRAC C6 and Office Suite
Levitt Center for University Advancement
Corporate Headquarters Renovation
Wyoming Farm Bureau Center
Parking Garage
Covered Walkway
Minnesota Farm Bureau Center
© 2020 BBS Architects | engineers, All rights reserved.