DuPont Pioneer, Inc.

Reid “E” Research Facility
Reid “E” Research Facility
Reid “E” Research Facility
Reid “E” Research Facility

Project Data: 132,000 SF
Construction Completed: May 1999
Construction Cost: $17,500,000

This 132,000 SF facility is the latest addition to Pioneer Hi-Bred International, Inc.’s Johnston, Iowa research campus. Designed to meet the client’s expansion needs through the year 2005, the building houses 24 laboratories, support spaces, and office space for both the research community, as well as for the company’s general population. In addition, 5,000 SF of insect rearing operations are accommodated in a lower level basement.

The 132,000 SF, three-story facility is composed of two distinct wings. One wing contains the laboratories and their support spaces along with office space for researchers working in the new labs. The other wing contains office support functions for the entire building, additional research community offices, and general non-research related office expansion. A three-story open “Commons” containing bridges between the two wings and a dramatic cantilevered stair, acts as a general gathering space where scientists meet and interact outside of the laboratory environment.

Drawing upon the model of the client’s highly successful existing laboratories and open office plan buildings, the structure is connected to the rest of the campus by on-grade concourse links to create an enclosed, landscaped courtyard with other existing buildings. Composed from a palette of brick masonry and aluminum curtainwall, the resulting exterior expression is a blend of building elements used previously on the campus with the intent to unify several recent building projects.

Executed as a “fast-track” project, the building’s construction was begun only four months after the beginning of the design process. BBS Architects | Engineers worked very closely with the Owner and members of the construction team in order to achieve this goal, and to help complete the $17.5 million project within the required one year construction period.

Dodge House Renovations
219 Eighth Street
Hub Tower Conference Center
Sabin Hall Renovation – LEED Gold
New Facility
Terminal
Chemistry Building Addition & Renovation
LeBaron Hall Replacement Study
Catholic Pastoral Center Rehabilitation
Office Renovation
Kemin Food Sciences Lab Renovation
Hospital Emergency Room Renovation & Expansion
Beardshear Hall Remodeling
ETRC Hoover Hall
Parking Garage
Coover Hall Infrastructure Study
Home Office Building with Expansion
Executive Suites Renovation
MacKay Hall Auditorium Renovation
VRAC C6 and Office Suite
Utah Farm Bureau Center
Covered Walkway
College of Human Sciences
Levitt Center for University Advancement
Iowa Events Center
New Office
Corporate Headquarters Renovation
Camp Dodge Urban Assault Course
Minnesota Farm Bureau Center
Camp Dodge Pool Campus Improvements
Wyoming Farm Bureau Center
Corporate Headquarters
Extension 4-H Youth Building
Arizona Farm Bureau Center
Biological Sciences Facility
Corporate Highrise
Geoffroy Residence Hall
Hub Tower Office Tenant Improvement
ETRC Howe Hall
© 2019 BBS Architects | engineers, All rights reserved.