BBS Architects Engineers

EMC Insurance Companies

EMC & City of Des Moines – Parking Garage
EMC & City of Des Moines – Parking Garage

Consultants:

  • Walker Parking Consultants/Engineers 
  • Structural Parking: Snyder and Associates Civil Engineers

Construction Completed: 2006
Project Data:

  • Capacity 1769 structured spaces
  • Area 525,809 SF

Construction Cost: $25,339,975

The parking facility is a joint venture between EMC Company and the City of Des Moines. The facility consists of two garages of eight levels each. The garages share common elevators and stairs and are designed to operate independently to allow for either garage to be removed in the future.

The post-tensioned concrete structure is clad with pre-cast concrete panels including screen walls to conceal the cars. The concrete beams and colored pre-cast panels along the east and west sides of the garages work to conceal the sloped ramps and to create a horizontal grid to relate to the surrounding buildings. The space between the two garages creates a courtyard, which provides natural light and ventilation and also contains landscaping at the ground level. At street level, planters clad with recycled granite provide separation between cars and pedestrians.

The stairways are completely open at the courtyard side or glass enclosed from the exterior to provide high visibility from the exterior and interior for enhanced occupant safety. The elevators also have glass backs for visual safety and natural light. The project includes connection to the existing skywalk.

Biological Sciences Facility
Corporate Headquarters Renovation
ETRC Hoover Hall
Covered Walkway
Levitt Center for University Advancement
ABC - Office Build-Out
Hub Tower Conference Center
Sabin Hall Renovation – LEED Gold
Kemin Food Sciences Lab Renovation
Iowa Events Center
Theodore Roosevelt High School Natatorium Improvements
Camp Dodge Urban Assault Course
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Office Renovation
Wyoming Farm Bureau Center
ETRC Howe Hall
Foth Companies Des Moines Office
Global Neighbors
Chemistry Building Addition & Renovation
Monroe Elementary School Improvements
Executive Suites Renovation
Home Office Building with Expansion
Reid “E” Research Facility
Lance and Ellie's Sandwich Shop
Camp Dodge Chapel Addition and Renovation
Science Center - New Facility
Moulton Performing & Visual Arts Signature School
Hospital Emergency Room Renovation & Expansion
Union Drive Community Center Renovations
Administration Building Renovation and Addition
Memorial Union Food Court
College of Human Sciences
Minnesota Farm Bureau Center
VRAC C6 and Office Suite
Coover Hall Infrastructure Study
LeBaron Hall Replacement Study
New Office
Terminal
Beardshear Hall Office Renovation
Camp Dodge Pool Campus Improvements
Extension 4-H Youth Building
219 Eighth Street
MacKay Hall Auditorium Renovation
Richard Bolling Federal Building Study and Arc Flash Assesment
Hub Tower Office Tenant Improvement
Food Sciences Building - Room 2379 Renovation
Geoffroy Residence Hall
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Dodge House Renovations
Federal Building Study and Arc Flash Assessment
BBS at 219 8th Street
Corporate Highrise
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
Iowa City Federal Building - VHA Renovations
IADA Office Renovation
Beardshear Hall Remodeling
Catholic Pastoral Center Rehabilitation
Utah Farm Bureau Center
Lincoln High School Improvements
Arizona Farm Bureau Center
© 2026 BBS Architects | engineers, All rights reserved.