BBS Architects Engineers

EMC Insurance Companies

EMC & City of Des Moines – Parking Garage
EMC & City of Des Moines – Parking Garage

Consultants:

  • Walker Parking Consultants/Engineers 
  • Structural Parking: Snyder and Associates Civil Engineers

Construction Completed: 2006
Project Data:

  • Capacity 1769 structured spaces
  • Area 525,809 SF

Construction Cost: $25,339,975

The parking facility is a joint venture between EMC Company and the City of Des Moines. The facility consists of two garages of eight levels each. The garages share common elevators and stairs and are designed to operate independently to allow for either garage to be removed in the future.

The post-tensioned concrete structure is clad with pre-cast concrete panels including screen walls to conceal the cars. The concrete beams and colored pre-cast panels along the east and west sides of the garages work to conceal the sloped ramps and to create a horizontal grid to relate to the surrounding buildings. The space between the two garages creates a courtyard, which provides natural light and ventilation and also contains landscaping at the ground level. At street level, planters clad with recycled granite provide separation between cars and pedestrians.

The stairways are completely open at the courtyard side or glass enclosed from the exterior to provide high visibility from the exterior and interior for enhanced occupant safety. The elevators also have glass backs for visual safety and natural light. The project includes connection to the existing skywalk.

Wyoming Farm Bureau Center
Hub Tower Office Tenant Improvement
Arizona Farm Bureau Center
Utah Farm Bureau Center
Corporate Headquarters
IADA Office Renovation
Iowa Events Center
Biological Sciences Facility
Sabin Hall Renovation – LEED Gold
Iowa City Federal Building - VHA Renovations
Hub Tower Conference Center
Geoffroy Residence Hall
College of Human Sciences
Lance and Ellie's Sandwich Shop
VRAC C6 and Office Suite
Levitt Center for University Advancement
Office Renovation
New Facility
Reid “E” Research Facility
Corporate Headquarters Renovation
Terminal
Coover Hall Infrastructure Study
Chemistry Building Addition & Renovation
Catholic Pastoral Center Rehabilitation
Dodge House Renovations
MacKay Hall Auditorium Renovation
Beardshear Hall Remodeling
Executive Suites Renovation
Corporate Highrise
New Office
Minnesota Farm Bureau Center
219 Eighth Street
Kemin Food Sciences Lab Renovation
Food Sciences Building - Room 2379 Renovation
Camp Dodge Urban Assault Course
ETRC Hoover Hall
Hospital Emergency Room Renovation & Expansion
Home Office Building with Expansion
Camp Dodge Pool Campus Improvements
Extension 4-H Youth Building
ETRC Howe Hall
LeBaron Hall Replacement Study
Memorial Union Food Court
Covered Walkway
© 2019 BBS Architects | engineers, All rights reserved.