BBS Architects Engineers

Iowa Army National Guard

Camp Dodge Pool Campus Improvements
Camp Dodge Pool Campus Improvements
Camp Dodge Pool Campus Improvements
Camp Dodge Pool Campus Improvements
Camp Dodge Pool Campus Improvements

Civil Engineering and Landscape Architecture Services: Snyder & Associates
Project Data:

  • Pool House Renovation: 
    • Size: 7,110 SF
    • Renovation Cost: $740,000,
    • Completed: 2009
  • Pool House West Wing Renovation
    • Size: 2,770 SF
      Renovation Cost: $326,090
    • Completed: 2011
  • Site Improvements
    • Cost: $2,600,000
    • Completed: 2010

The Camp Dodge Pool Pavilion Complex projects included rehabilitation of the Historic Pool House, Concession Stand, and highlights the original pool rim. New features and amenities were also added to the complex including a reviewing stand, seating area, and expanded parking areas. The renovated and restored Pool Complex support the current and future operational needs of the Iowa Army National Guard (IAARNG).

The renovation of the Historic Pool House included restoration of the exterior envelope and adaptive reuse of the building interior from former locker room facilities into a new space for conferences and special events. The event space extends from the interior out onto the front porch of the Pool House and a large paved area including a water feature that recalls the Complex’s historic function as a community pool. The Concession Stand was renovated and returned to its origins as an open-air structure providing space for cooking and serving food. A large patio adjacent to the Concession Stand provides space for gathering and dining, and it connects the building to the pool perimeter walkway.

The Historic Pool Pavilion Complex rehabilitation from a swimming and training facility into a multi-functional campus has preserved historically significant structures, features, materials, and spatial relationships of the site will providing adaptable spaces for current and future functions. The improvements create a cohesive campus that tells the story of its rich history while meeting the IAARNG’s needs for multi-functional training facilities, event spaces, and even public entertainment opportunities: the Adjutant General’s Concert Series is held at the Pool House Complex each summer.

Richard Bolling Federal Building Study and Arc Flash Assesment
Coover Hall Infrastructure Study
Theodore Roosevelt High School Natatorium Improvements
Extension 4-H Youth Building
Geoffroy Residence Hall
Biological Sciences Facility
Terminal
Corporate Highrise
Hospital Emergency Room Renovation & Expansion
Administration Building Renovation and Addition
Parking Garage
Global Neighbors
Iowa City Federal Building - VHA Renovations
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Hub Tower Conference Center
Home Office Building with Expansion
ABC - Office Build-Out
Hub Tower Office Tenant Improvement
BBS at 219 8th Street
Beardshear Hall Office Renovation
Iowa Events Center
College of Human Sciences
Memorial Union Food Court
Moulton Performing & Visual Arts Signature School
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Camp Dodge Chapel Addition and Renovation
Union Drive Community Center Renovations
Beardshear Hall Remodeling
Arizona Farm Bureau Center
VRAC C6 and Office Suite
Levitt Center for University Advancement
Science Center - New Facility
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
Lance and Ellie's Sandwich Shop
Kemin Food Sciences Lab Renovation
Sabin Hall Renovation – LEED Gold
Minnesota Farm Bureau Center
Executive Suites Renovation
IADA Office Renovation
Office Renovation
Chemistry Building Addition & Renovation
Utah Farm Bureau Center
MacKay Hall Auditorium Renovation
Federal Building Study and Arc Flash Assessment
ETRC Howe Hall
ETRC Hoover Hall
Dodge House Renovations
Monroe Elementary School Improvements
Covered Walkway
Camp Dodge Urban Assault Course
LeBaron Hall Replacement Study
Food Sciences Building - Room 2379 Renovation
Wyoming Farm Bureau Center
Reid “E” Research Facility
219 Eighth Street
New Office
Lincoln High School Improvements
Catholic Pastoral Center Rehabilitation
Corporate Headquarters Renovation
© 2026 BBS Architects | engineers, All rights reserved.