BBS Architects Engineers

Iowa State University

Coover Hall Infrastructure Study
Coover Hall Infrastructure Study

Owner: Iowa State University

Project Data: Coover Hall 29,730 GSF

Study Completion Date: 2016

Client Need: The original building of Coover Hall was finished in 1950 and has been transitioned from a classroom and laboratory building to a primarily office building following a 2007 addition to the building. Much of the building’s infrastructure are either functionally inadequate or approaching the end of their useful life. The College of Engineering (COE) and the Electrical and Computer Engineering Department (ECpE) requested that BBS Architects | Engineers complete a study on the building’s deficiencies focusing on exterior windows, mechanical and electrical infrastructure systems and building common spaces including corridors, student lounge spaces, and restrooms.

BBS Approach: Through observation and BIM modeling in Revit BBS assessed the general conditions and potential improvements in Coover Hall. While the main focus of this study was on upgrading the current Coover Hall, BBS was able to explore how some major modifications to the building could add useable square feet without increasing the existing building perimeter.

The main goals of the study were as follows:

  • Evaluate exterior masonry and windows and identify how replacements or upgrades may benefit the quality of interior spaces and energy savings.

  • Identify programmatic needs of Coover Hall and uses of current common spaces by students and faculty. Provide recommendations for updating finishes, restrooms, and circulation throughout the building.

  • Identify and evaluate the current mechanical equipment (air handlers, heat exchangers, water heaters, and fans and pumps) as well as the terminal equipment (finned tube and window air conditioners). Propose renovations and upgrades to HVAC systems to make heating and cooling more efficient.

  • Evaluate the electrical systems, telecommunication systems, and lighting systems. Propose updates to meet energy codes and building codes.

Study Results: Based on the investigation BBS determined that the College of Engineering and the Computer Engineering Department would benefit from both exterior and interior renovations. New exterior windows, a new HVAC system along with a chilled beam system and an air- handling unit, and LED lighting and controls would drastically increase the building’s energy efficiency and comfort. Common spaces need updating to meet restroom fixture requirements as well as ADA accessibility requirements. Updating the circulation and finishes in these common spaces will create a more welcoming space upon entering the building and assist in wayfinding ques. Future space needs for the College and Engineering and the Computer Engineering Department would potentially require further renovations of the courtyard and office layouts offering more space within the current perimeter of the building.

Union Drive Community Center Renovations
Corporate Headquarters Renovation
Minnesota Farm Bureau Center
Chemistry Building Addition & Renovation
Corporate Highrise
Wyoming Farm Bureau Center
Camp Dodge Urban Assault Course
Camp Dodge Pool Campus Improvements
Parking Garage
Reid “E” Research Facility
Iowa City Federal Building - VHA Renovations
Sabin Hall Renovation – LEED Gold
Hub Tower Office Tenant Improvement
Biological Sciences Facility
Home Office Building with Expansion
Camp Dodge Chapel Addition and Renovation
Kemin Food Sciences Lab Renovation
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
BBS at 219 8th Street
Utah Farm Bureau Center
IADA Office Renovation
Iowa Events Center
Terminal
Dodge House Renovations
Levitt Center for University Advancement
MacKay Hall Auditorium Renovation
Hub Tower Conference Center
ETRC Hoover Hall
Office Renovation
Arizona Farm Bureau Center
Geoffroy Residence Hall
Beardshear Hall Remodeling
Food Sciences Building - Room 2379 Renovation
College of Human Sciences
Lance and Ellie's Sandwich Shop
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
Science Center - New Facility
New Office
ABC - Office Build-Out
Executive Suites Renovation
ETRC Howe Hall
Hub Tower Elevator Modernization
Extension 4-H Youth Building
Federal Building Study and Arc Flash Assessment
LeBaron Hall Replacement Study
Covered Walkway
Catholic Pastoral Center Rehabilitation
219 Eighth Street
Richard Bolling Federal Building Study and Arc Flash Assesment
Memorial Union Food Court
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Hospital Emergency Room Renovation & Expansion
VRAC C6 and Office Suite
© 2025 BBS Architects | engineers, All rights reserved.