BBS Architects Engineers

Iowa State University

Geoffroy Residence Hall
Geoffroy Residence Hall
Geoffroy Residence Hall
Geoffroy Residence Hall

Construction Data:

  • Design Build Construction Budget: $40 Million
  • Completed: December 2016

A rapidly expanding enrollment and demand for on-campus student housing initiated the University’s request for the design and construction of a new residence hall using design-build delivery. BBSAE teamed with The Opus Group to successfully respond to the selection process. The design-build team’s solution provides an 8-story high-rise dormitory.

A new central mechanical plant generating chilled and heating water is provided to serve Geoffroy Hall and the existing Buchanan Hall. The new plants are both of variable primary arrangement with variable- speed, magnetic bearing chillers, condensing boilers and variable speed pumps.

The existing air-cooled chiller, steam-to-hot-water heat exchangers and steam-fired water heaters in Buchanan were removed. New directed buried piping connects the Geoffroy Hall plant with the existing building. Plate-and frame heat exchangers in Buchanan provide for the transfer of energy between the Geoffroy Hall plants and the Buchanan chilled and heating water systems. New high-efficiency, gas-fired semi- instantaneous water heaters with storage tanks generate domestic hot-water for Buchanan. The mechanical space in Buchanan containing the heating plant equipment, fire pump and water entrance is very limited. Removal of the steam infrastructure allowed for installation of the new gas-fired water heaters, storage tanks and plate and frame heat exchangers, but extensive on-site field verification and a 3D Revit model were utilized to coordinate installation and ensure service clearances and walkways were maintained as much as possible.

Union Drive Community Center Renovations
Arizona Farm Bureau Center
Lance and Ellie's Sandwich Shop
Hospital Emergency Room Renovation & Expansion
BBS at 219 8th Street
Office Renovation
Extension 4-H Youth Building
Camp Dodge Chapel Addition and Renovation
Terminal
ABC - Office Build-Out
Memorial Union Food Court
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Home Office Building with Expansion
Reid “E” Research Facility
Corporate Headquarters Renovation
Camp Dodge Urban Assault Course
VRAC C6 and Office Suite
Wyoming Farm Bureau Center
Catholic Pastoral Center Rehabilitation
College of Human Sciences
Iowa Events Center
Hub Tower Conference Center
Covered Walkway
Biological Sciences Facility
Federal Building Study and Arc Flash Assessment
LeBaron Hall Replacement Study
Executive Suites Renovation
Kemin Food Sciences Lab Renovation
Food Sciences Building - Room 2379 Renovation
Chemistry Building Addition & Renovation
Iowa City Federal Building - VHA Renovations
Coover Hall Infrastructure Study
ETRC Hoover Hall
ETRC Howe Hall
Richard Bolling Federal Building Study and Arc Flash Assesment
Hub Tower Office Tenant Improvement
Hub Tower Elevator Modernization
Sabin Hall Renovation – LEED Gold
Dodge House Renovations
Science Center - New Facility
Beardshear Hall Remodeling
New Office
Corporate Highrise
IADA Office Renovation
Parking Garage
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Levitt Center for University Advancement
Utah Farm Bureau Center
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
MacKay Hall Auditorium Renovation
Minnesota Farm Bureau Center
Camp Dodge Pool Campus Improvements
219 Eighth Street
© 2024 BBS Architects | engineers, All rights reserved.