BBS Architects Engineers

Iowa State University

College of Human Sciences

Construction Data:

  • Human Nutritional Sciences Building: 34,400 SF
  • LeBaron Hall: 61,500 SF
  • MacKay Hall: 86,400 SF
  • Palmer Building: 34,400 SF

Completion Date: January 2014

Evolving space needs in four linked buildings near the heart of the ISU campus initiated this study of the building systems to determine how well the existing buildings will support programmatic needs. The Dean of the College and Facilities Planning and Management requested a summative graphic document that would quickly communicate conclusions reached in the study. A series of green-yellow-red color coded plans summarize good-fair-poor conditions for each primary system. A detailed narrative and spreadsheets provide the in-depth information needed to support future maintenance and planning strategies by the University.

BBS Architects | Engineers reviewed existing drawings and performed a visual assessment to prepare the report. Conditions and capacities of each primary site and building system were assessed including primary mechanical and electrical equipment. Architectural spatial quality was also reviewed. Corridor and wayfinding systems, restroom locations and capacities, and general visual characteristics of entrances and primary spaces were documented.

Hub Tower Office Tenant Improvement
Home Office Building with Expansion
Arizona Farm Bureau Center
Corporate Highrise
Iowa City Federal Building - VHA Renovations
Dodge House Renovations
Geoffroy Residence Hall
IADA Office Renovation
Office Renovation
Union Drive Community Center Renovations
Hub Tower Conference Center
Parking Garage
Terminal
Corporate Headquarters Renovation
Covered Walkway
Minnesota Farm Bureau Center
Utah Farm Bureau Center
ETRC Howe Hall
BBS at 219 8th Street
219 Eighth Street
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Hub Tower Elevator Modernization
LeBaron Hall Replacement Study
Coover Hall Infrastructure Study
Memorial Union Food Court
Executive Suites Renovation
Camp Dodge Pool Campus Improvements
MacKay Hall Auditorium Renovation
Wyoming Farm Bureau Center
Camp Dodge Chapel Addition and Renovation
Levitt Center for University Advancement
Food Sciences Building - Room 2379 Renovation
VRAC C6 and Office Suite
Biological Sciences Facility
Catholic Pastoral Center Rehabilitation
Federal Building Study and Arc Flash Assessment
Kemin Food Sciences Lab Renovation
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Richard Bolling Federal Building Study and Arc Flash Assesment
ETRC Hoover Hall
Camp Dodge Urban Assault Course
Hospital Emergency Room Renovation & Expansion
Reid “E” Research Facility
Lance and Ellie's Sandwich Shop
ABC - Office Build-Out
New Office
Science Center - New Facility
Extension 4-H Youth Building
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
Chemistry Building Addition & Renovation
Beardshear Hall Remodeling
Iowa Events Center
Sabin Hall Renovation – LEED Gold
© 2025 BBS Architects | engineers, All rights reserved.