BBS Architects Engineers

Iowa State University

College of Human Sciences

Construction Data:

  • Human Nutritional Sciences Building: 34,400 SF
  • LeBaron Hall: 61,500 SF
  • MacKay Hall: 86,400 SF
  • Palmer Building: 34,400 SF

Completion Date: January 2014

Evolving space needs in four linked buildings near the heart of the ISU campus initiated this study of the building systems to determine how well the existing buildings will support programmatic needs. The Dean of the College and Facilities Planning and Management requested a summative graphic document that would quickly communicate conclusions reached in the study. A series of green-yellow-red color coded plans summarize good-fair-poor conditions for each primary system. A detailed narrative and spreadsheets provide the in-depth information needed to support future maintenance and planning strategies by the University.

BBS Architects | Engineers reviewed existing drawings and performed a visual assessment to prepare the report. Conditions and capacities of each primary site and building system were assessed including primary mechanical and electrical equipment. Architectural spatial quality was also reviewed. Corridor and wayfinding systems, restroom locations and capacities, and general visual characteristics of entrances and primary spaces were documented.

IADA Office Renovation
ETRC Hoover Hall
Sabin Hall Renovation – LEED Gold
Home Office Building with Expansion
ABC - Office Build-Out
Reid “E” Research Facility
Union Drive Community Center Renovations
Science Center - New Facility
Geoffroy Residence Hall
Lance and Ellie's Sandwich Shop
Catholic Pastoral Center Rehabilitation
Arizona Farm Bureau Center
Office Renovation
Hospital Emergency Room Renovation & Expansion
Hub Tower Conference Center
Federal Building Study and Arc Flash Assessment
Camp Dodge Pool Campus Improvements
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
LeBaron Hall Replacement Study
Terminal
Corporate Highrise
219 Eighth Street
Parking Garage
Wyoming Farm Bureau Center
Coover Hall Infrastructure Study
Iowa Events Center
Biological Sciences Facility
Hub Tower Office Tenant Improvement
BBS at 219 8th Street
Food Sciences Building - Room 2379 Renovation
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Executive Suites Renovation
Beardshear Hall Remodeling
Camp Dodge Chapel Addition and Renovation
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Levitt Center for University Advancement
Corporate Headquarters Renovation
New Office
Memorial Union Food Court
Iowa City Federal Building - VHA Renovations
ETRC Howe Hall
Hub Tower Elevator Modernization
MacKay Hall Auditorium Renovation
Kemin Food Sciences Lab Renovation
Minnesota Farm Bureau Center
Dodge House Renovations
Extension 4-H Youth Building
Covered Walkway
Camp Dodge Urban Assault Course
VRAC C6 and Office Suite
Richard Bolling Federal Building Study and Arc Flash Assesment
Chemistry Building Addition & Renovation
Utah Farm Bureau Center
© 2025 BBS Architects | engineers, All rights reserved.