BBS Architects Engineers

University of Iowa

Biological Sciences Facility
Biological Sciences Facility
Biological Sciences Facility
Biological Sciences Facility

Project Data: 60,200 GSF
Construction Cost: $11,700,000
Construction Completed: 2000

Client Need:
The goal for Biology Building East was to be part of a multi-phase construction project to provide state-of-the-art teaching and research facilities for the Department of Biological Sciences. In addition to the new building, four existing Biology buildings will be renovated and provided with new mechanical, electrical and life safety systems

BBS Approach:
BBS provided design services to meet the client’s stated goal.

Project Results:

  • Construction of the new building allows the Department to vacate large sections of the existing facilities, enabling renovations and remodeling with minimal disruptions to ongoing teaching and research.
  • The building provides the Department with flexible teaching and research space, accommodating changing technologies and directions.
  • Teaching facilities are clustered on the first floor and include teaching labs, an auditorium, and seminar room.
  • Upper floors of the building contain research functions including a rooftop greenhouse.
  • Located across Dubuque Street from the existing buildings, a skywalk was designed to connect the new building to the existing Biology Complex.
Theodore Roosevelt High School Natatorium Improvements
Global Neighbors
Parking Garage
Monroe Elementary School Improvements
ABC - Office Build-Out
Richard Bolling Federal Building Study and Arc Flash Assesment
Camp Dodge Chapel Addition and Renovation
219 Eighth Street
Office Renovation
Memorial Union Food Court
Terminal
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
LeBaron Hall Replacement Study
Catholic Pastoral Center Rehabilitation
Corporate Highrise
Coover Hall Infrastructure Study
New Office
Hospital Emergency Room Renovation & Expansion
Beardshear Hall Remodeling
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Lance and Ellie's Sandwich Shop
Extension 4-H Youth Building
Levitt Center for University Advancement
ETRC Howe Hall
Camp Dodge Urban Assault Course
Reid “E” Research Facility
Dodge House Renovations
Federal Building Study and Arc Flash Assessment
Ames Laboratory TASF and Spedding Hall Arc Flash Study
Moulton Performing & Visual Arts Signature School
Headquarters Building
Utah Farm Bureau Center
Food Sciences Building - Room 2379 Renovation
Geoffroy Residence Hall
Kemin Food Sciences Lab Renovation
Sabin Hall Renovation – LEED Gold
VRAC C6 and Office Suite
Chemistry Building Addition & Renovation
ETRC Hoover Hall
Beardshear Hall Office Renovation
MacKay Hall Auditorium Renovation
Camp Dodge Pool Campus Improvements
Covered Walkway
Union Drive Community Center Renovations
IADA Office Renovation
Hub Tower Conference Center
Minnesota Farm Bureau Center
BBS at 219 8th Street
Science Center - New Facility
College of Human Sciences
Iowa City Federal Building - VHA Renovations
Lincoln High School Improvements
Executive Suites Renovation
Foth Companies Des Moines Office
Administration Building Renovation and Addition
Iowa Events Center
© 2026 BBS Architects | engineers, All rights reserved.