BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Camp Dodge Urban Assault Course
Global Neighbors
Lance and Ellie's Sandwich Shop
Administration Building Renovation and Addition
Corporate Highrise
Levitt Center for University Advancement
Parking Garage
Office Renovation
Terminal
Geoffroy Residence Hall
Hub Tower Office Tenant Improvement
Hub Tower Conference Center
Kemin Food Sciences Lab Renovation
College of Human Sciences
Richard Bolling Federal Building Study and Arc Flash Assesment
Beardshear Hall Office Renovation
Memorial Union Food Court
Federal Building Study and Arc Flash Assessment
Dodge House Renovations
Hospital Emergency Room Renovation & Expansion
Beardshear Hall Remodeling
Wyoming Farm Bureau Center
Arizona Farm Bureau Center
Monroe Elementary School Improvements
Biological Sciences Facility
Camp Dodge Chapel Addition and Renovation
ETRC Hoover Hall
Minnesota Farm Bureau Center
Chemistry Building Addition & Renovation
Ames Laboratory TASF and Spedding Hall Arc Flash Study
BBS at 219 8th Street
VRAC C6 and Office Suite
Covered Walkway
Utah Farm Bureau Center
Union Drive Community Center Renovations
Camp Dodge Pool Campus Improvements
Coover Hall Infrastructure Study
LeBaron Hall Replacement Study
ABC - Office Build-Out
Moulton Performing & Visual Arts Signature School
IADA Office Renovation
Iowa Events Center
Catholic Pastoral Center Rehabilitation
MacKay Hall Auditorium Renovation
Ames Laboratory Metal Development and Wilhelm Hall Electrical Study
219 Eighth Street
ETRC Howe Hall
Ames Laboratory Metal Development and Wilhelm Hall Electrical Upgrades
Sabin Hall Renovation – LEED Gold
Food Sciences Building - Room 2379 Renovation
Iowa City Federal Building - VHA Renovations
New Office
Extension 4-H Youth Building
Lincoln High School Improvements
Corporate Headquarters Renovation
Home Office Building with Expansion
Reid “E” Research Facility
Theodore Roosevelt High School Natatorium Improvements
Science Center - New Facility
© 2026 BBS Architects | engineers, All rights reserved.