BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Parking Garage
Corporate Headquarters Renovation
Memorial Union Food Court
Kemin Food Sciences Lab Renovation
IADA Office Renovation
Office Renovation
Iowa Events Center
Food Sciences Building - Room 2379 Renovation
Beardshear Hall Remodeling
Minnesota Farm Bureau Center
Geoffroy Residence Hall
New Facility
Camp Dodge Urban Assault Course
MacKay Hall Auditorium Renovation
219 Eighth Street
LeBaron Hall Replacement Study
Catholic Pastoral Center Rehabilitation
Home Office Building with Expansion
Dodge House Renovations
Wyoming Farm Bureau Center
Levitt Center for University Advancement
Lance and Ellie's Sandwich Shop
Camp Dodge Pool Campus Improvements
Sabin Hall Renovation – LEED Gold
ETRC Hoover Hall
Chemistry Building Addition & Renovation
Hub Tower Conference Center
Reid “E” Research Facility
Extension 4-H Youth Building
Coover Hall Infrastructure Study
College of Human Sciences
Utah Farm Bureau Center
Hospital Emergency Room Renovation & Expansion
Iowa City Federal Building - VHA Renovations
Corporate Headquarters
New Office
Terminal
Covered Walkway
Biological Sciences Facility
Arizona Farm Bureau Center
Hub Tower Office Tenant Improvement
Corporate Highrise
VRAC C6 and Office Suite
ETRC Howe Hall
© 2019 BBS Architects | engineers, All rights reserved.