BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Corporate Highrise
Chemistry Building Addition & Renovation
Minnesota Farm Bureau Center
Iowa Events Center
Corporate Headquarters Renovation
Levitt Center for University Advancement
Coover Hall Infrastructure Study
VRAC C6 and Office Suite
Beardshear Hall Remodeling
219 Eighth Street
ETRC Hoover Hall
Terminal
Catholic Pastoral Center Rehabilitation
LeBaron Hall Replacement Study
Covered Walkway
ETRC Howe Hall
New Facility
Hub Tower Office Tenant Improvement
Camp Dodge Urban Assault Course
Extension 4-H Youth Building
Dodge House Renovations
College of Human Sciences
Biological Sciences Facility
Sabin Hall Renovation – LEED Gold
Utah Farm Bureau Center
Parking Garage
Hospital Emergency Room Renovation & Expansion
Office Renovation
Kemin Food Sciences Lab Renovation
Corporate Headquarters
Reid “E” Research Facility
Arizona Farm Bureau Center
Home Office Building with Expansion
Hub Tower Conference Center
Wyoming Farm Bureau Center
MacKay Hall Auditorium Renovation
Geoffroy Residence Hall
Camp Dodge Pool Campus Improvements
New Office
© 2019 BBS Architects | engineers, All rights reserved.