BBS Architects Engineers

BBS Architects Engineers Office

Owner: BBS Architects | Engineers

Architectural and Engineering Design Services: BBS Architects | Engineers

General Contractor: Neumann Brothers, Inc.

Construction Completed: 2017

Project Data: 6,130 sf

 

Client Need: After 10 years we decided we needed an upgrade in our office to better represent our working style and current staff. The centralized core divided the engineering department and architectural department making it difficult for collaboration; the tinted single pane windows allowed little light into the space while offering no insulation. Several small meeting spaces were set up for collaborative meetings but were rarely used. 

BBS Approach: The tenant space on ground level of 219 offered a naturally lit space with high ceilings and an open floor plan. By consolidating our past meeting areas into one private conference room and one open multi-use space we were able to move from a larger floor plan to a smaller one. The engineering and architectural departments are connected in an open office layout making interoffice collaboration easier. The Materials Library is organized in several shelves with an open table for layout space and material boards. Tack-able wall space allows a space for displaying finished work, sketches, process drawings and photos, or material boards. 

Project Results:

  • Connectivity between architects and engineers
  • Street Presence
  • Multi-use open collaboration meeting areas
  • Natural lighting
  • Efficient and well lit library and layout space
Office Renovation
Extension 4-H Youth Building
Beardshear Hall Remodeling
Iowa City Federal Building - VHA Renovations
Hub Tower Elevator Modernization
Hub Tower Conference Center
VRAC C6 and Office Suite
Goodnow Hall Restoration & Renovation
Covered Walkway
Food Sciences Building - Room 2379 Renovation
New Office
Dodge House Renovations
ETRC Hoover Hall
Kemin Food Sciences Lab Renovation
Sabin Hall Renovation – LEED Gold
Terminal
Camp Dodge Pool Campus Improvements
Chemistry Building Addition & Renovation
ABC - Office Build-Out
Corporate Highrise
Common Ground - Coffee Shop
IADA Office Renovation
Camp Dodge Chapel Addition and Renovation
Biological Sciences Facility
Union Drive Community Center Renovations
Corporate Headquarters Renovation
Reid “E” Research Facility
Levitt Center for University Advancement
219 Eighth Street
Hospital Emergency Room Renovation & Expansion
MacKay Hall Auditorium Renovation
Home Office Building with Expansion
Executive Suites Renovation
ETRC Howe Hall
Corporate Headquarters
© 2023 BBS Architects | engineers, All rights reserved.