Owner: EMC Insurance Companies
Architectural and Engineering Design Services: BBS Architects | Engineers
Construction Completed: 1997
Project Data: 430,000 SF
Construction Cost: $53,000,000

Client Need:
EMC expanded their downtown Des Moines location by adding this corporate high-rise adjacent to their existing headquarters building. They sought to achieve a bold and sophisticated image through the building design.

BBS Approach:
The sculptural expression was developed to take advantage of the building’s location within the skyline. Viewed from the west, the angled roof acts to counter the gradual decline of heights from north to south along the downtown skyline. Viewed from the south, the higher tower face establishes a strong figural identity for the EMC complex.

Project Results:

  • 430,000 SF expansion
  • 20-story office tower plus three-story support facility
  • Addition of three new skywalks
  • Two-level underground parking facility
  • Sophisticated cladding technology
  • Cutting-edge mechanical/electrical system
  • Advanced energy-conservation design:
    • Thermal storage
    • Low temperature air distribution
    • High-efficiency (R-7) windows

Industry Recognition:

  • When constructed, the EMC tower was the largest US installation of innovative “rainscreen” system
  • Awarded First Place in regional technology by the American Society of Refrigerating and Air Conditioning Engineers (ASHRAE)
VRAC C6 and Office Suite
Covered Walkway
Hub Tower Conference Center
Hospital Emergency Room Renovation & Expansion
219 Eighth Street
Biological Sciences Facility
Camp Dodge Pool Campus Improvements
Extension 4-H Youth Building
ETRC Howe Hall
Kemin Food Sciences Lab Renovation
Beardshear Hall Remodeling
MacKay Hall Auditorium Renovation
Terminal
Sabin Hall Renovation – LEED Gold
Executive Suites Renovation
Reid “E” Research Facility
Corporate Headquarters Renovation
Office Renovation
Corporate Headquarters
Chemistry Building Addition & Renovation
Levitt Center for University Advancement
ETRC Hoover Hall
New Office
Food Sciences Building - Room 2379 Renovation
Goodnow Hall Restoration & Renovation
Corporate Headquarters
Home Office Building with Expansion
Dodge House Renovations
© 2019 BBS Architects | engineers, All rights reserved.