BBS Architects Engineers

Iowa Army National Guard

Camp Dodge Pool Campus Improvements
Camp Dodge Pool Campus Improvements
Camp Dodge Pool Campus Improvements
Camp Dodge Pool Campus Improvements
Camp Dodge Pool Campus Improvements

Civil Engineering and Landscape Architecture Services: Snyder & Associates
Project Data:

  • Pool House Renovation: 
    • Size: 7,110 SF
    • Renovation Cost: $740,000,
    • Completed: 2009
  • Pool House West Wing Renovation
    • Size: 2,770 SF
      Renovation Cost: $326,090
    • Completed: 2011
  • Site Improvements
    • Cost: $2,600,000
    • Completed: 2010

The Camp Dodge Pool Pavilion Complex projects included rehabilitation of the Historic Pool House, Concession Stand, and highlights the original pool rim. New features and amenities were also added to the complex including a reviewing stand, seating area, and expanded parking areas. The renovated and restored Pool Complex support the current and future operational needs of the Iowa Army National Guard (IAARNG).

The renovation of the Historic Pool House included restoration of the exterior envelope and adaptive reuse of the building interior from former locker room facilities into a new space for conferences and special events. The event space extends from the interior out onto the front porch of the Pool House and a large paved area including a water feature that recalls the Complex’s historic function as a community pool. The Concession Stand was renovated and returned to its origins as an open-air structure providing space for cooking and serving food. A large patio adjacent to the Concession Stand provides space for gathering and dining, and it connects the building to the pool perimeter walkway.

The Historic Pool Pavilion Complex rehabilitation from a swimming and training facility into a multi-functional campus has preserved historically significant structures, features, materials, and spatial relationships of the site will providing adaptable spaces for current and future functions. The improvements create a cohesive campus that tells the story of its rich history while meeting the IAARNG’s needs for multi-functional training facilities, event spaces, and even public entertainment opportunities: the Adjutant General’s Concert Series is held at the Pool House Complex each summer.

Dodge House Renovations
ETRC Hoover Hall
Office Renovation
Covered Walkway
Corporate Headquarters
Levitt Center for University Advancement
Corporate Highrise
MacKay Hall Auditorium Renovation
Hospital Emergency Room Renovation & Expansion
Chemistry Building Addition & Renovation
Extension 4-H Youth Building
Home Office Building with Expansion
ETRC Howe Hall
VRAC C6 and Office Suite
Kemin Food Sciences Lab Renovation
Beardshear Hall Remodeling
219 Eighth Street
Reid “E” Research Facility
Corporate Headquarters
Terminal
Corporate Headquarters Renovation
Biological Sciences Facility
Executive Suites Renovation
Sabin Hall Renovation – LEED Gold
Goodnow Hall Restoration & Renovation
Hub Tower Conference Center
New Office
© 2019 BBS Architects | engineers, All rights reserved.