BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Sabin Hall Renovation – LEED Gold
VRAC C6 and Office Suite
Hub Tower Conference Center
New Office
Corporate Highrise
Camp Dodge Chapel Addition and Renovation
Chemistry Building Addition & Renovation
MacKay Hall Auditorium Renovation
Corporate Headquarters
Goodnow Hall Restoration & Renovation
Hub Tower Elevator Modernization
Home Office Building with Expansion
Kemin Food Sciences Lab Renovation
IADA Office Renovation
Iowa City Federal Building - VHA Renovations
Corporate Headquarters Renovation
219 Eighth Street
Dodge House Renovations
Reid “E” Research Facility
Union Drive Community Center Renovations
Beardshear Hall Remodeling
BBS at 219 8th Street
Hospital Emergency Room Renovation & Expansion
Food Sciences Building - Room 2379 Renovation
Terminal
Extension 4-H Youth Building
Covered Walkway
Office Renovation
Biological Sciences Facility
ETRC Howe Hall
Levitt Center for University Advancement
ABC - Office Build-Out
ETRC Hoover Hall
Common Ground - Coffee Shop
Camp Dodge Pool Campus Improvements
© 2024 BBS Architects | engineers, All rights reserved.