BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Corporate Headquarters
ETRC Howe Hall
Camp Dodge Pool Campus Improvements
Dodge House Renovations
Beardshear Hall Remodeling
219 Eighth Street
Terminal
Home Office Building with Expansion
Hospital Emergency Room Renovation & Expansion
Biological Sciences Facility
Corporate Headquarters
Chemistry Building Addition & Renovation
Corporate Headquarters Renovation
Goodnow Hall Restoration & Renovation
Sabin Hall Renovation – LEED Gold
Reid “E” Research Facility
MacKay Hall Auditorium Renovation
Extension 4-H Youth Building
New Office
ETRC Hoover Hall
Kemin Food Sciences Lab Renovation
VRAC C6 and Office Suite
Corporate Highrise
Covered Walkway
Hub Tower Conference Center
Office Renovation
Levitt Center for University Advancement
© 2019 BBS Architects | engineers, All rights reserved.