BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Home Office Building with Expansion
MacKay Hall Auditorium Renovation
Corporate Headquarters
Levitt Center for University Advancement
Beardshear Hall Remodeling
219 Eighth Street
Dodge House Renovations
Reid “E” Research Facility
Sabin Hall Renovation – LEED Gold
Kemin Food Sciences Lab Renovation
Covered Walkway
Food Sciences Building - Room 2379 Renovation
Biological Sciences Facility
Hub Tower Conference Center
Corporate Highrise
VRAC C6 and Office Suite
Extension 4-H Youth Building
ETRC Hoover Hall
Iowa City Federal Building - VHA Renovations
Goodnow Hall Restoration & Renovation
Hospital Emergency Room Renovation & Expansion
Camp Dodge Pool Campus Improvements
Chemistry Building Addition & Renovation
ABC - Office Build-Out
New Office
IADA Office Renovation
Office Renovation
ETRC Howe Hall
Terminal
Corporate Headquarters Renovation
© 2021 BBS Architects | engineers, All rights reserved.