BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Goodnow Hall Restoration & Renovation
Terminal
Sabin Hall Renovation – LEED Gold
Camp Dodge Pool Campus Improvements
Corporate Headquarters
ETRC Hoover Hall
Chemistry Building Addition & Renovation
Biological Sciences Facility
Extension 4-H Youth Building
Office Renovation
Levitt Center for University Advancement
Kemin Food Sciences Lab Renovation
Hospital Emergency Room Renovation & Expansion
Covered Walkway
219 Eighth Street
Corporate Headquarters
Reid “E” Research Facility
New Office
Dodge House Renovations
Home Office Building with Expansion
Corporate Highrise
VRAC C6 and Office Suite
Beardshear Hall Remodeling
Hub Tower Conference Center
MacKay Hall Auditorium Renovation
ETRC Howe Hall
Corporate Headquarters Renovation
© 2019 BBS Architects | engineers, All rights reserved.