BBS Architects Engineers

BBS Architects Engineers Office

Owner: BBS Architects | Engineers

Architectural and Engineering Design Services: BBS Architects | Engineers

General Contractor: Neumann Brothers, Inc.

Construction Completed: 2017

Project Data: 6,130 sf

 

Client Need: After 10 years we decided we needed an upgrade in our office to better represent our working style and current staff. The centralized core divided the engineering department and architectural department making it difficult for collaboration; the tinted single pane windows allowed little light into the space while offering no insulation. Several small meeting spaces were set up for collaborative meetings but were rarely used. 

BBS Approach: The tenant space on ground level of 219 offered a naturally lit space with high ceilings and an open floor plan. By consolidating our past meeting areas into one private conference room and one open multi-use space we were able to move from a larger floor plan to a smaller one. The engineering and architectural departments are connected in an open office layout making interoffice collaboration easier. The Materials Library is organized in several shelves with an open table for layout space and material boards. Tack-able wall space allows a space for displaying finished work, sketches, process drawings and photos, or material boards. 

Project Results:

  • Connectivity between architects and engineers
  • Street Presence
  • Multi-use open collaboration meeting areas
  • Natural lighting
  • Efficient and well lit library and layout space
Ames Lab Metals Development Air Handling Unit Replacement
Home Office Building with Expansion
ETRC Hoover Hall
Covered Walkway
Minnesota Farm Bureau Center
Corporate Headquarters Renovation
Extension 4-H Youth Building
Levitt Center for University Advancement
Biological Sciences Facility
Lied Recreation Center - New Heating Water Plant
Sabin Hall Renovation – LEED Gold
Geoffroy Residence Hall
IADA Office Renovation
Science Center - New Facility
LeBaron Hall Replacement Study
Hub Tower Elevator Modernization
Beardshear Hall Remodeling
ABC - Office Build-Out
Iowa City Federal Building - VHA Renovations
Arizona Farm Bureau Center
Iowa Events Center
VRAC C6 and Office Suite
Hospital Emergency Room Renovation & Expansion
Catholic Pastoral Center Rehabilitation
Camp Dodge Pool Campus Improvements
ETRC Howe Hall
Office Renovation
219 Eighth Street
Executive Suites Renovation
Hub Tower Conference Center
Union Drive Community Center Renovations
MacKay Hall Auditorium Renovation
Corporate Highrise
Utah Farm Bureau Center
Camp Dodge Chapel Addition and Renovation
Food Sciences Building - Room 2379 Renovation
Wyoming Farm Bureau Center
DSM Airport Energy Effiency Improvements
Kemin Food Sciences Lab Renovation
Parking Garage
College of Human Sciences
Dodge House Renovations
New Office
Lance and Ellie's Sandwich Shop
Coover Hall Infrastructure Study
Memorial Union Food Court
Common Ground - Coffee Shop
Hub Tower Office Tenant Improvement
Terminal
Reid “E” Research Facility
© 2023 BBS Architects | engineers, All rights reserved.