BBS Architects Engineers

EMC Insurance Companies

EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise

Owner: EMC Insurance Companies
Architectural and Engineering Design Services: BBS Architects | Engineers
Construction Completed: 1997
Project Data: 430,000 SF
Construction Cost: $53,000,000

Client Need:
EMC expanded their downtown Des Moines location by adding this corporate high-rise adjacent to their existing headquarters building. They sought to achieve a bold and sophisticated image through the building design.

BBS Approach:
The sculptural expression was developed to take advantage of the building’s location within the skyline. Viewed from the west, the angled roof acts to counter the gradual decline of heights from north to south along the downtown skyline. Viewed from the south, the higher tower face establishes a strong figural identity for the EMC complex.

Project Results:

  • 430,000 SF expansion
  • 20-story office tower plus three-story support facility
  • Addition of three new skywalks
  • Two-level underground parking facility
  • Sophisticated cladding technology
  • Cutting-edge mechanical/electrical system
  • Advanced energy-conservation design:
    • Thermal storage
    • Low temperature air distribution
    • High-efficiency (R-7) windows

Industry Recognition:

  • When constructed, the EMC tower was the largest US installation of innovative “rainscreen” system
  • Awarded First Place in regional technology by the American Society of Refrigerating and Air Conditioning Engineers (ASHRAE)
College of Human Sciences
Common Ground - Coffee Shop
Hub Tower Office Tenant Improvement
Catholic Pastoral Center Rehabilitation
Corporate Headquarters Renovation
Coover Hall Infrastructure Study
Camp Dodge Chapel Addition and Renovation
Camp Dodge Pool Campus Improvements
Food Sciences Building - Room 2379 Renovation
DSM Airport Energy Effiency Improvements
Lance and Ellie's Sandwich Shop
Biological Sciences Facility
New Office
Utah Farm Bureau Center
Memorial Union Food Court
Extension 4-H Youth Building
Arizona Farm Bureau Center
Home Office Building with Expansion
Geoffroy Residence Hall
Science Center - New Facility
ETRC Howe Hall
Office Renovation
IADA Office Renovation
Iowa Events Center
Dodge House Renovations
Kemin Food Sciences Lab Renovation
Ames Lab Metals Development Air Handling Unit Replacement
VRAC C6 and Office Suite
Reid “E” Research Facility
LeBaron Hall Replacement Study
Beardshear Hall Remodeling
Iowa City Federal Building - VHA Renovations
Moulton Performing & Visual Arts Signature School
Wyoming Farm Bureau Center
Minnesota Farm Bureau Center
Lincoln High School Improvements
ETRC Hoover Hall
MacKay Hall Auditorium Renovation
Hub Tower Conference Center
Beardshear Hall Office Renovation
Hospital Emergency Room Renovation & Expansion
219 Eighth Street
Parking Garage
Executive Suites Renovation
Terminal
Global Neighbors
Covered Walkway
Theodore Roosevelt High School Natatorium Improvements
Sabin Hall Renovation – LEED Gold
Levitt Center for University Advancement
Lied Recreation Center - New Heating Water Plant
ABC - Office Build-Out
BBS at 219 8th Street
Administration Building Renovation and Addition
Union Drive Community Center Renovations
© 2026 BBS Architects | engineers, All rights reserved.