BBS Architects Engineers

EMC Insurance Companies

EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise
EMC – Corporate Highrise

Owner: EMC Insurance Companies
Architectural and Engineering Design Services: BBS Architects | Engineers
Construction Completed: 1997
Project Data: 430,000 SF
Construction Cost: $53,000,000

Client Need:
EMC expanded their downtown Des Moines location by adding this corporate high-rise adjacent to their existing headquarters building. They sought to achieve a bold and sophisticated image through the building design.

BBS Approach:
The sculptural expression was developed to take advantage of the building’s location within the skyline. Viewed from the west, the angled roof acts to counter the gradual decline of heights from north to south along the downtown skyline. Viewed from the south, the higher tower face establishes a strong figural identity for the EMC complex.

Project Results:

  • 430,000 SF expansion
  • 20-story office tower plus three-story support facility
  • Addition of three new skywalks
  • Two-level underground parking facility
  • Sophisticated cladding technology
  • Cutting-edge mechanical/electrical system
  • Advanced energy-conservation design:
    • Thermal storage
    • Low temperature air distribution
    • High-efficiency (R-7) windows

Industry Recognition:

  • When constructed, the EMC tower was the largest US installation of innovative “rainscreen” system
  • Awarded First Place in regional technology by the American Society of Refrigerating and Air Conditioning Engineers (ASHRAE)
LeBaron Hall Replacement Study
Geoffroy Residence Hall
Lied Recreation Center - New Heating Water Plant
Ames Lab Metals Development Air Handling Unit Replacement
Covered Walkway
219 Eighth Street
Utah Farm Bureau Center
Corporate Headquarters Renovation
New Office
Levitt Center for University Advancement
Catholic Pastoral Center Rehabilitation
Kemin Food Sciences Lab Renovation
MacKay Hall Auditorium Renovation
Arizona Farm Bureau Center
Camp Dodge Chapel Addition and Renovation
Minnesota Farm Bureau Center
Memorial Union Food Court
Terminal
Dodge House Renovations
Hub Tower Conference Center
Coover Hall Infrastructure Study
IADA Office Renovation
College of Human Sciences
Wyoming Farm Bureau Center
Hub Tower Office Tenant Improvement
Beardshear Hall Remodeling
Hospital Emergency Room Renovation & Expansion
Food Sciences Building - Room 2379 Renovation
Union Drive Community Center Renovations
Office Renovation
Reid “E” Research Facility
DSM Airport Energy Effiency Improvements
Sabin Hall Renovation – LEED Gold
Executive Suites Renovation
Biological Sciences Facility
VRAC C6 and Office Suite
Iowa Events Center
Camp Dodge Pool Campus Improvements
ABC - Office Build-Out
Science Center - New Facility
Hub Tower Elevator Modernization
Lance and Ellie's Sandwich Shop
ETRC Howe Hall
Common Ground - Coffee Shop
Iowa City Federal Building - VHA Renovations
Extension 4-H Youth Building
Parking Garage
BBS at 219 8th Street
Home Office Building with Expansion
ETRC Hoover Hall
© 2024 BBS Architects | engineers, All rights reserved.