BBS Architects Engineers

EMC Insurance Companies

EMC & City of Des Moines – Parking Garage
EMC & City of Des Moines – Parking Garage

Consultants:

  • Walker Parking Consultants/Engineers 
  • Structural Parking: Snyder and Associates Civil Engineers

Construction Completed: 2006
Project Data:

  • Capacity 1769 structured spaces
  • Area 525,809 SF

Construction Cost: $25,339,975

The parking facility is a joint venture between EMC Company and the City of Des Moines. The facility consists of two garages of eight levels each. The garages share common elevators and stairs and are designed to operate independently to allow for either garage to be removed in the future.

The post-tensioned concrete structure is clad with pre-cast concrete panels including screen walls to conceal the cars. The concrete beams and colored pre-cast panels along the east and west sides of the garages work to conceal the sloped ramps and to create a horizontal grid to relate to the surrounding buildings. The space between the two garages creates a courtyard, which provides natural light and ventilation and also contains landscaping at the ground level. At street level, planters clad with recycled granite provide separation between cars and pedestrians.

The stairways are completely open at the courtyard side or glass enclosed from the exterior to provide high visibility from the exterior and interior for enhanced occupant safety. The elevators also have glass backs for visual safety and natural light. The project includes connection to the existing skywalk.

Geoffroy Residence Hall
College of Human Sciences
Union Drive Community Center Renovations
Hub Tower Elevator Modernization
Wyoming Farm Bureau Center
Memorial Union Food Court
Coover Hall Infrastructure Study
Food Sciences Building - Room 2379 Renovation
Minnesota Farm Bureau Center
Executive Suites Renovation
Ames Lab Metals Development Air Handling Unit Replacement
IADA Office Renovation
Office Renovation
Biological Sciences Facility
Extension 4-H Youth Building
Utah Farm Bureau Center
VRAC C6 and Office Suite
MacKay Hall Auditorium Renovation
Lance and Ellie's Sandwich Shop
Hub Tower Conference Center
Catholic Pastoral Center Rehabilitation
Kemin Food Sciences Lab Renovation
Beardshear Hall Remodeling
ETRC Hoover Hall
Hospital Emergency Room Renovation & Expansion
Iowa Events Center
Camp Dodge Pool Campus Improvements
Iowa City Federal Building - VHA Renovations
Reid “E” Research Facility
Lied Recreation Center - New Heating Water Plant
ABC - Office Build-Out
Covered Walkway
Science Center - New Facility
ETRC Howe Hall
Levitt Center for University Advancement
Corporate Headquarters Renovation
Arizona Farm Bureau Center
DSM Airport Energy Effiency Improvements
New Office
Sabin Hall Renovation – LEED Gold
LeBaron Hall Replacement Study
Corporate Highrise
219 Eighth Street
Home Office Building with Expansion
Terminal
Hub Tower Office Tenant Improvement
Dodge House Renovations
© 2023 BBS Architects | engineers, All rights reserved.