BBS Architects Engineers

EMC Insurance Companies

Hub Tower Conference Center
Hub Tower Conference Center

Owner: EMC Insurance Companies
Architectural and Engineering Design Services: BBS Architects | Engineers
Construction Completed: 2011 and 2012

Client Need:
In 2011, EMC Insurance Companies purchased the HUB Tower Office Building, a 20-story brick and glass tower with a two-story mall development, subsequently purchased by EMC. First and second levels of the Tower are limited to entry lobbies on ground and skywalk levels. EMC wished to develop a Conference Center on a portion of the third floor.

BBS Approach: Locating the Conference Center away from most of the exterior views allowed the third floor of Hub Tower to remain available for quality office spaces. The interior conference rooms and meetings rooms offer a central location for large meetings or training events to be held. The Hub Tower Conference Center also allowed BBS and EMC to work to create an interior finish standard for the rest of the building.

Project Results:

The conferencing amenity for tenants of the Tower includes:

  • Four large meeting rooms
  • Serving kitchen
  • Storage for coats, tables and chairs
  • Large pre-function lobby space for receptions and break-outs between meetings
  • The project also included the development of building standards for finishes and lighting throughout.
  • Since the improvements were completed, building occupancy has increased over 20%.
ABC - Office Build-Out
Lied Recreation Center - New Heating Water Plant
Iowa Events Center
Lance and Ellie's Sandwich Shop
New Office
Science Center - New Facility
IADA Office Renovation
Extension 4-H Youth Building
Camp Dodge Pool Campus Improvements
LeBaron Hall Replacement Study
Reid “E” Research Facility
Iowa City Federal Building - VHA Renovations
Memorial Union Food Court
Kemin Food Sciences Lab Renovation
Sabin Hall Renovation – LEED Gold
Catholic Pastoral Center Rehabilitation
MacKay Hall Auditorium Renovation
Ames Lab Metals Development Air Handling Unit Replacement
Hub Tower Office Tenant Improvement
Dodge House Renovations
Minnesota Farm Bureau Center
Corporate Highrise
Office Renovation
Food Sciences Building - Room 2379 Renovation
Union Drive Community Center Renovations
Biological Sciences Facility
Terminal
VRAC C6 and Office Suite
Levitt Center for University Advancement
DSM Airport Energy Effiency Improvements
Hub Tower Elevator Modernization
219 Eighth Street
Covered Walkway
Corporate Headquarters Renovation
Arizona Farm Bureau Center
ETRC Hoover Hall
Executive Suites Renovation
Parking Garage
Coover Hall Infrastructure Study
Beardshear Hall Remodeling
Utah Farm Bureau Center
Home Office Building with Expansion
ETRC Howe Hall
Geoffroy Residence Hall
Wyoming Farm Bureau Center
Hospital Emergency Room Renovation & Expansion
College of Human Sciences
© 2022 BBS Architects | engineers, All rights reserved.