BBS Architects Engineers

Iowa State University

Extension 4-H Youth Building
Extension 4-H Youth Building
Extension 4-H Youth Building
Extension 4-H Youth Building

Project Data: 23,000 GSF
Construction Cost: $3,300,000
Completion Date: October 2003

Envisioned as a “front door” for Extension Services to the Iowa State Campus, the Extension 4-H Youth Building is both an office building for Extension’s Communications and 4-H Youth programs, and an interactive exhibit space for Iowa Youth. Other spaces included in the building are video and radio studios for Extension Communications.

Located on the north side of campus, the building forms on the edge of an open courtyard bordered by campus office buildings. The building design consists of three linear and ascending volumes: open office space, building support space, and exhibit space. The three volumes are expressed by different materials. The office space is clad in horizontal ribbed metal panels, the support space in terracotta colored brick, and the exhibit space in curtainwall infilled with green glass and metal panels.

Corporate Highrise
Lance and Ellie's Sandwich Shop
Hub Tower Conference Center
Camp Dodge Pool Campus Improvements
LeBaron Hall Replacement Study
New Office
Food Sciences Building - Room 2379 Renovation
Iowa City Federal Building - VHA Renovations
Executive Suites Renovation
Utah Farm Bureau Center
College of Human Sciences
ETRC Howe Hall
Arizona Farm Bureau Center
Sabin Hall Renovation – LEED Gold
Geoffroy Residence Hall
Reid “E” Research Facility
Wyoming Farm Bureau Center
Minnesota Farm Bureau Center
Iowa Events Center
MacKay Hall Auditorium Renovation
Catholic Pastoral Center Rehabilitation
Coover Hall Infrastructure Study
Office Renovation
Dodge House Renovations
New Facility
Kemin Food Sciences Lab Renovation
Levitt Center for University Advancement
Covered Walkway
Home Office Building with Expansion
Hub Tower Office Tenant Improvement
Memorial Union Food Court
IADA Office Renovation
Hospital Emergency Room Renovation & Expansion
VRAC C6 and Office Suite
Beardshear Hall Remodeling
Corporate Headquarters Renovation
Terminal
Corporate Headquarters
Biological Sciences Facility
ETRC Hoover Hall
219 Eighth Street
Parking Garage
© 2019 BBS Architects | engineers, All rights reserved.