BBS Architects Engineers

Iowa State University

Geoffroy Residence Hall
Geoffroy Residence Hall
Geoffroy Residence Hall
Geoffroy Residence Hall

Construction Data:

  • Design Build Construction Budget: $40 Million
  • Completed: December 2016

A rapidly expanding enrollment and demand for on-campus student housing initiated the University’s request for the design and construction of a new residence hall using design-build delivery. BBSAE teamed with The Opus Group to successfully respond to the selection process. The design-build team’s solution provides an 8-story high-rise dormitory.

A new central mechanical plant generating chilled and heating water is provided to serve Geoffroy Hall and the existing Buchanan Hall. The new plants are both of variable primary arrangement with variable- speed, magnetic bearing chillers, condensing boilers and variable speed pumps.

The existing air-cooled chiller, steam-to-hot-water heat exchangers and steam-fired water heaters in Buchanan were removed. New directed buried piping connects the Geoffroy Hall plant with the existing building. Plate-and frame heat exchangers in Buchanan provide for the transfer of energy between the Geoffroy Hall plants and the Buchanan chilled and heating water systems. New high-efficiency, gas-fired semi- instantaneous water heaters with storage tanks generate domestic hot-water for Buchanan. The mechanical space in Buchanan containing the heating plant equipment, fire pump and water entrance is very limited. Removal of the steam infrastructure allowed for installation of the new gas-fired water heaters, storage tanks and plate and frame heat exchangers, but extensive on-site field verification and a 3D Revit model were utilized to coordinate installation and ensure service clearances and walkways were maintained as much as possible.

Hub Tower Conference Center
Hospital Emergency Room Renovation & Expansion
College of Human Sciences
Corporate Highrise
Office Renovation
Reid “E” Research Facility
Catholic Pastoral Center Rehabilitation
Sabin Hall Renovation – LEED Gold
Dodge House Renovations
Camp Dodge Chapel Addition and Renovation
Ames Lab Metals Development Air Handling Unit Replacement
Extension 4-H Youth Building
Coover Hall Infrastructure Study
Arizona Farm Bureau Center
Levitt Center for University Advancement
Common Ground - Coffee Shop
New Office
Utah Farm Bureau Center
Covered Walkway
Terminal
Biological Sciences Facility
Food Sciences Building - Room 2379 Renovation
Administration Building Renovation and Addition
Wyoming Farm Bureau Center
Iowa Events Center
Parking Garage
LeBaron Hall Replacement Study
Science Center - New Facility
Camp Dodge Pool Campus Improvements
ETRC Hoover Hall
Lincoln High School Improvements
Kemin Food Sciences Lab Renovation
IADA Office Renovation
ETRC Howe Hall
Moulton Performing & Visual Arts Signature School
BBS at 219 8th Street
Theodore Roosevelt High School Natatorium Improvements
Hub Tower Office Tenant Improvement
Home Office Building with Expansion
Executive Suites Renovation
Memorial Union Food Court
Beardshear Hall Office Renovation
219 Eighth Street
Union Drive Community Center Renovations
Lied Recreation Center - New Heating Water Plant
Global Neighbors
Minnesota Farm Bureau Center
Corporate Headquarters Renovation
MacKay Hall Auditorium Renovation
VRAC C6 and Office Suite
Lance and Ellie's Sandwich Shop
Iowa City Federal Building - VHA Renovations
ABC - Office Build-Out
Beardshear Hall Remodeling
DSM Airport Energy Effiency Improvements
© 2026 BBS Architects | engineers, All rights reserved.