BBS Architects Engineers

Iowa State University

MacKay Hall Auditorium Renovation
MacKay Hall Auditorium Renovation
MacKay Hall Auditorium Renovation
MacKay Hall Auditorium Renovation
MacKay Hall Auditorium Renovation
MacKay Hall Auditorium Renovation

Construction Data:
Size: 8,340 GSF Renovation
Construction Cost:

  • Estimated: $2,007,887
  • Bid: $1,928,000
  • Final: $2,155,488

Completion Date: 2014
 

The location, size and historical character of MacKay Hall establish this building and the related MacKay Hall Auditorium as significant landmarks within the context of the ISU campus. The design team was challenged by ISU’s College of Human Sciences to transform underutilized spaces in the building into enticing teaching and learning spaces to serve Iowa State’s rapidly growing student body.

The renovation of the first floor auditorium and adjacent spaces creates an optimum learning environment for 215 students within a rehabilitated historic envelope. An isolated balcony was removed in favor of stadium style platforms with swivel seating to facilitate interactive learning. State of the art lighting and communications technology complete the transformation.

Behind the seating platforms on first floor, a former lounge has been transformed to a welcome center functionally and visibly with two new offices and glass partitions. An adjacent corridor and large entry vestibule were rehabilitated to preserve historic materials. Batchelder tile fountains and a Christian Petersen designed sculpture were restored by the University.

Above the vestibule on second floor, a lecture room with stepped seating and obsolete fixed furniture was fully renovated into a 36 student classroom to meet the demand for small group interactive classes. Movable furniture, computer monitors and portable marker boards facilitate flexible and group learning.

Utah Farm Bureau Center
Iowa City Federal Building - VHA Renovations
Office Renovation
Hub Tower Office Tenant Improvement
Coover Hall Infrastructure Study
IADA Office Renovation
Home Office Building with Expansion
Camp Dodge Chapel Addition and Renovation
Science Center - New Facility
Hub Tower Elevator Modernization
Corporate Highrise
Minnesota Farm Bureau Center
Wyoming Farm Bureau Center
Terminal
Covered Walkway
ETRC Howe Hall
VRAC C6 and Office Suite
ABC - Office Build-Out
Extension 4-H Youth Building
Hub Tower Conference Center
Reid “E” Research Facility
219 Eighth Street
ETRC Hoover Hall
Camp Dodge Pool Campus Improvements
Beardshear Hall Remodeling
New Office
Geoffroy Residence Hall
Lied Recreation Center - New Heating Water Plant
BBS at 219 8th Street
Common Ground - Coffee Shop
Sabin Hall Renovation – LEED Gold
Kemin Food Sciences Lab Renovation
Memorial Union Food Court
Executive Suites Renovation
Ames Lab Metals Development Air Handling Unit Replacement
Catholic Pastoral Center Rehabilitation
Union Drive Community Center Renovations
Biological Sciences Facility
Hospital Emergency Room Renovation & Expansion
Iowa Events Center
Corporate Headquarters Renovation
LeBaron Hall Replacement Study
Arizona Farm Bureau Center
Food Sciences Building - Room 2379 Renovation
Lance and Ellie's Sandwich Shop
Parking Garage
DSM Airport Energy Effiency Improvements
College of Human Sciences
Levitt Center for University Advancement
Dodge House Renovations
© 2023 BBS Architects | engineers, All rights reserved.