BBS Architects Engineers

Iowa State University

College of Human Sciences

Construction Data:

  • Human Nutritional Sciences Building: 34,400 SF
  • LeBaron Hall: 61,500 SF
  • MacKay Hall: 86,400 SF
  • Palmer Building: 34,400 SF

Completion Date: January 2014

Evolving space needs in four linked buildings near the heart of the ISU campus initiated this study of the building systems to determine how well the existing buildings will support programmatic needs. The Dean of the College and Facilities Planning and Management requested a summative graphic document that would quickly communicate conclusions reached in the study. A series of green-yellow-red color coded plans summarize good-fair-poor conditions for each primary system. A detailed narrative and spreadsheets provide the in-depth information needed to support future maintenance and planning strategies by the University.

BBS Architects | Engineers reviewed existing drawings and performed a visual assessment to prepare the report. Conditions and capacities of each primary site and building system were assessed including primary mechanical and electrical equipment. Architectural spatial quality was also reviewed. Corridor and wayfinding systems, restroom locations and capacities, and general visual characteristics of entrances and primary spaces were documented.

ABC - Office Build-Out
Administration Building Renovation and Addition
Ames Lab Metals Development Air Handling Unit Replacement
BBS at 219 8th Street
Beardshear Hall Office Renovation
Beardshear Hall Remodeling
Biological Sciences Facility
Camp Dodge Chapel Addition and Renovation
Camp Dodge Pool Campus Improvements
Catholic Pastoral Center Rehabilitation
Common Ground - Coffee Shop
Coover Hall Infrastructure Study
Corporate Headquarters Renovations
Corporate Highrise
Covered Walkway
Dodge House Renovations
DSM Airport Energy Effiency Improvements
EMC 219 Eighth Street
ETRC Hoover Hall
ETRC Howe Hall
Executive Suites Renovation
Extension 4-H Youth Building
Food Sciences Building - Room 2379 Renovation
Foth Companies Des Moines Office
Geoffroy Residence Hall
Global Neighbors
Headquarters Building
Hospital Emergency Room Renovation & Expansion
Hub Tower Conference Center
IADA Office Renovation
Iowa City Federal Building - VHA Renovations
Iowa Events Center
Kemin Food Sciences Lab Renovation
Lance and Ellie's Sandwich Shop
LeBaron Hall Replacement Study
Levitt Center for University Advancement
Lied Recreation Center - New Heating Water Plant
Lincoln High School Improvements
MacKay Hall Auditorium Renovation
Memorial Union Food Court
Minnesota Farm Bureau Center
Moulton Performing & Visual Arts Signature School
New Office
Office Renovation
Parking Garage
Reid “E” Research Facility
Sabin Hall Renovation – LEED Gold
Science Center - New Facility
Terminal
Theodore Roosevelt High School Natatorium Improvements
Union Drive Community Center Renovations
Utah Farm Bureau Center
VRAC C6 and Office Suite
© 2026 BBS Architects | engineers, All rights reserved.