BBS Architects Engineers

Iowa State University

Owner: Iowa State University
Architectural and Engineering Design Services: BBS Architects | Engineers
Construction Completed: October 2018
 

Client Need 
The existing steam line serving Lied Rec Center was in need of replacement.  Replacement of this line would be difficult and costly due to the conflicts with several other utilities and Lied Rec was now the only building served by this line.  ISU Utilities choose to abandon the existing steam line serving Lied Rec and provide a new gas-fired heating water plant within the building to meet building heating and domestic water needs.  
Approach 
The existing steam pressure reducing station, steam-to-water heat exchangers and heating water pumps for the building are located in a second floor mechanical room that also contains several air handlers.  Locating the new boiler plant in place of the existing steam infrastructure made sense but two key issues needed to be addressed: maintaining domestic hot-water and building reheat during construction and separating the boilers from the mechanical room that functioned as a return air plenum.  This involved creating a phased construction plan during design, which allowed for 100% availability of domestic hot water, and providing a new Boiler Rm within the existing mechanical room.
Solution 
Four new gas-fired heating water boilers comprise the new heating water plant.  One of the boilers is a condensing style and the other three are non-condensing.  With existing heating devices sized for a higher heating water temperature, it did not make sense to provide all condensing boilers for the building, when the system would only operate in a condensing mode during the summer.  Domestic water heating is provided by plate-and-frame water-to-water heat exchangers that are fed by the new boiler plant.  New correctly sized heating water distribution pumps with VFDs are provided.  A new room was constructed around the new boilers.  New electrical service was extended to the new equipment.  ISU Utilities provided new gas service to the building for the new boilers. 
 

Parking Garage
Catholic Pastoral Center Rehabilitation
Iowa Events Center
Union Drive Community Center Renovations
MacKay Hall Auditorium Renovation
ETRC Hoover Hall
Lance and Ellie's Sandwich Shop
Reid “E” Research Facility
Extension 4-H Youth Building
VRAC C6 and Office Suite
BBS at 219 8th Street
LeBaron Hall Replacement Study
Dodge House Renovations
Wyoming Farm Bureau Center
Ames Lab Metals Development Air Handling Unit Replacement
Arizona Farm Bureau Center
Global Neighbors
Coover Hall Infrastructure Study
Levitt Center for University Advancement
Utah Farm Bureau Center
Common Ground - Coffee Shop
ETRC Howe Hall
Iowa City Federal Building - VHA Renovations
Hub Tower Office Tenant Improvement
Beardshear Hall Remodeling
Hub Tower Conference Center
Corporate Headquarters Renovation
Lincoln High School Improvements
Moulton Performing & Visual Arts Signature School
Camp Dodge Chapel Addition and Renovation
Beardshear Hall Office Renovation
Memorial Union Food Court
DSM Airport Energy Effiency Improvements
Sabin Hall Renovation – LEED Gold
Kemin Food Sciences Lab Renovation
Terminal
Camp Dodge Pool Campus Improvements
ABC - Office Build-Out
Food Sciences Building - Room 2379 Renovation
Theodore Roosevelt High School Natatorium Improvements
Corporate Highrise
219 Eighth Street
Home Office Building with Expansion
New Office
Science Center - New Facility
Geoffroy Residence Hall
Biological Sciences Facility
College of Human Sciences
Office Renovation
Executive Suites Renovation
Minnesota Farm Bureau Center
Covered Walkway
IADA Office Renovation
Hospital Emergency Room Renovation & Expansion
Administration Building Renovation and Addition
© 2026 BBS Architects | engineers, All rights reserved.