Client Need 
The existing steam line serving Lied Rec Center was in need of replacement.  Replacement of this line would be difficult and costly due to the conflicts with several other utilities and Lied Rec was now the only building served by this line.  ISU Utilities choose to abandon the existing steam line serving Lied Rec and provide a new gas-fired heating water plant within the building to meet building heating and domestic water needs.  
Approach 
The existing steam pressure reducing station, steam-to-water heat exchangers and heating water pumps for the building are located in a second floor mechanical room that also contains several air handlers.  Locating the new boiler plant in place of the existing steam infrastructure made sense but two key issues needed to be addressed: maintaining domestic hot-water and building reheat during construction and separating the boilers from the mechanical room that functioned as a return air plenum.  This involved creating a phased construction plan during design, which allowed for 100% availability of domestic hot water, and providing a new Boiler Rm within the existing mechanical room.
Solution 
Four new gas-fired heating water boilers comprise the new heating water plant.  One of the boilers is a condensing style and the other three are non-condensing.  With existing heating devices sized for a higher heating water temperature, it did not make sense to provide all condensing boilers for the building, when the system would only operate in a condensing mode during the summer.  Domestic water heating is provided by plate-and-frame water-to-water heat exchangers that are fed by the new boiler plant.  New correctly sized heating water distribution pumps with VFDs are provided.  A new room was constructed around the new boilers.  New electrical service was extended to the new equipment.  ISU Utilities provided new gas service to the building for the new boilers. 
 

Office Renovation
Home Office Building with Expansion
Memorial Union Food Court
Camp Dodge Pool Campus Improvements
Dodge House Renovations
LeBaron Hall Replacement Study
Arizona Farm Bureau Center
Food Sciences Building - Room 2379 Renovation
Extension 4-H Youth Building
Hub Tower Elevator Modernization
Terminal
Coover Hall Infrastructure Study
Corporate Headquarters Renovation
Hospital Emergency Room Renovation & Expansion
IADA Office Renovation
Sabin Hall Renovation – LEED Gold
Geoffroy Residence Hall
New Facility
ETRC Howe Hall
Lance and Ellie's Sandwich Shop
Hub Tower Conference Center
DSM Airport Energy Effiency Improvements
Parking Garage
Executive Suites Renovation
Biological Sciences Facility
Hub Tower Office Tenant Improvement
Beardshear Hall Remodeling
Covered Walkway
Levitt Center for University Advancement
Reid “E” Research Facility
Catholic Pastoral Center Rehabilitation
219 Eighth Street
ETRC Hoover Hall
Iowa Events Center
College of Human Sciences
Kemin Food Sciences Lab Renovation
MacKay Hall Auditorium Renovation
Wyoming Farm Bureau Center
Utah Farm Bureau Center
ABC - Office Build-Out
Minnesota Farm Bureau Center
VRAC C6 and Office Suite
Iowa City Federal Building - VHA Renovations
Corporate Highrise
New Office
Union Drive Community Center Renovations
Ames Lab Metals Development Air Handling Unit Replacement
© 2022 BBS Architects | engineers, All rights reserved.