BBS Architects Engineers

The University of Iowa

Biological Sciences Facility
Biological Sciences Facility
Biological Sciences Facility
Biological Sciences Facility

Project Data: 60,200 GSF
Construction Cost: $11,700,000
Construction Completed: 2000

Client Need:
The goal for Biology Building East was to be part of a multi-phase construction project to provide state-of-the-art teaching and research facilities for the Department of Biological Sciences. In addition to the new building, four existing Biology buildings will be renovated and provided with new mechanical, electrical and life safety systems

BBS Approach:
BBS provided design services to meet the client’s stated goal.

Project Results:

  • Construction of the new building allows the Department to vacate large sections of the existing facilities, enabling renovations and remodeling with minimal disruptions to ongoing teaching and research.
  • The building provides the Department with flexible teaching and research space, accommodating changing technologies and directions.
  • Teaching facilities are clustered on the first floor and include teaching labs, an auditorium, and seminar room.
  • Upper floors of the building contain research functions including a rooftop greenhouse.
  • Located across Dubuque Street from the existing buildings, a skywalk was designed to connect the new building to the existing Biology Complex.
Home Office Building with Expansion
219 Eighth Street
Lance and Ellie's Sandwich Shop
Reid “E” Research Facility
IADA Office Renovation
Office Renovation
Iowa Events Center
Utah Farm Bureau Center
Kemin Food Sciences Lab Renovation
New Office
Covered Walkway
ABC - Office Build-Out
Minnesota Farm Bureau Center
New Facility
Beardshear Hall Remodeling
Corporate Highrise
Dodge House Renovations
Corporate Headquarters Renovation
ETRC Howe Hall
Executive Suites Renovation
College of Human Sciences
Catholic Pastoral Center Rehabilitation
Memorial Union Food Court
Levitt Center for University Advancement
Wyoming Farm Bureau Center
Food Sciences Building - Room 2379 Renovation
Camp Dodge Pool Campus Improvements
Hub Tower Conference Center
Iowa City Federal Building - VHA Renovations
Extension 4-H Youth Building
MacKay Hall Auditorium Renovation
Hospital Emergency Room Renovation & Expansion
Sabin Hall Renovation – LEED Gold
Union Drive Community Center Renovations
Arizona Farm Bureau Center
LeBaron Hall Replacement Study
VRAC C6 and Office Suite
Hub Tower Office Tenant Improvement
Terminal
Geoffroy Residence Hall
Coover Hall Infrastructure Study
Parking Garage
ETRC Hoover Hall
© 2021 BBS Architects | engineers, All rights reserved.