BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Sabin Hall Renovation – LEED Gold
VRAC C6 and Office Suite
ETRC Howe Hall
Hub Tower Conference Center
Union Drive Community Center Renovations
Hub Tower Elevator Modernization
Science Center - New Facility
MacKay Hall Auditorium Renovation
Levitt Center for University Advancement
Terminal
Home Office Building with Expansion
BBS at 219 8th Street
LeBaron Hall Replacement Study
Extension 4-H Youth Building
Camp Dodge Chapel Addition and Renovation
Utah Farm Bureau Center
Coover Hall Infrastructure Study
Wyoming Farm Bureau Center
Reid “E” Research Facility
219 Eighth Street
Minnesota Farm Bureau Center
Lied Recreation Center - New Heating Water Plant
Hospital Emergency Room Renovation & Expansion
Dodge House Renovations
Common Ground - Coffee Shop
Covered Walkway
Arizona Farm Bureau Center
Food Sciences Building - Room 2379 Renovation
ABC - Office Build-Out
Iowa Events Center
Parking Garage
Beardshear Hall Remodeling
Corporate Highrise
Catholic Pastoral Center Rehabilitation
Iowa City Federal Building - VHA Renovations
New Office
Geoffroy Residence Hall
Ames Lab Metals Development Air Handling Unit Replacement
ETRC Hoover Hall
Corporate Headquarters Renovation
DSM Airport Energy Effiency Improvements
Office Renovation
Biological Sciences Facility
College of Human Sciences
Kemin Food Sciences Lab Renovation
IADA Office Renovation
Camp Dodge Pool Campus Improvements
Memorial Union Food Court
Lance and Ellie's Sandwich Shop
Hub Tower Office Tenant Improvement
© 2024 BBS Architects | engineers, All rights reserved.