BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

VRAC C6 and Office Suite
Parking Garage
Hub Tower Conference Center
219 Eighth Street
Hub Tower Office Tenant Improvement
Levitt Center for University Advancement
Reid “E” Research Facility
Iowa Events Center
New Office
Beardshear Hall Remodeling
Sabin Hall Renovation – LEED Gold
Extension 4-H Youth Building
Wyoming Farm Bureau Center
Arizona Farm Bureau Center
Dodge House Renovations
Hospital Emergency Room Renovation & Expansion
Minnesota Farm Bureau Center
Camp Dodge Pool Campus Improvements
Terminal
Coover Hall Infrastructure Study
College of Human Sciences
Corporate Headquarters Renovation
Utah Farm Bureau Center
Covered Walkway
ETRC Hoover Hall
LeBaron Hall Replacement Study
Kemin Food Sciences Lab Renovation
ETRC Howe Hall
MacKay Hall Auditorium Renovation
Office Renovation
Geoffroy Residence Hall
Corporate Highrise
Biological Sciences Facility
Home Office Building with Expansion
New Facility
Catholic Pastoral Center Rehabilitation
Corporate Headquarters
© 2019 BBS Architects | engineers, All rights reserved.