Project Data:

  • Relocate/Widen Circle Drive:
    • Cost: $1,505,000
  • Building Expansion and Renovation:
    • New Construction: 7,700 SF
    • Renovation 4,900 SF
    • Cost: $3,800,000

Construction Completed: 2013

The Emergency Department (ER) has outgrown its existing facilities and to accommodate the growth, a new addition and accompanying renovation of the current facilities is necessary. Design objectives include providing additional exam space to meet privacy requirements, improving staffing efficiency, accommodating drive-through ambulance bays on the site, accommodating a future second floor and integrating the addition architecturally with the adjacent facilities. In addition the ER entry and lobby will double as the public entrance to the Medical Center during nights and weekends.

Exam spaces are expanded from two shared and three private existing rooms to 10 private cart rooms and four exam rooms. A centralized nurse station improves staff efficiency. Dedicated access and egress drives to and from the new enclosed ambulance bays and a new public drop off canopy and drive with new parking spaces facilitate traffic flow and public wayfinding. The building addition is blended with the existing facility with matching brick and cast stone accents. A curved cast stone faced wall and new canopy delineates the public entrance. The public lobby and waiting areas feature ample daylighting and views to the exterior.

Construction is occurring in one site phase and three building phases. The site phase entails the relocation of a portion of the Circle Drive adjacent to the ER to provide adequate site area for the building addition, vehicular access, and visitor parking. Concrete retaining walls, paving, site utilities, and lighting comprise the project scope.

Building phases address the need to maintain continuous occupancy in the ER. The first phase is the construction of the entrance and waiting areas, followed by the remainder of the new addition including treatment spaces and concluding with renovation of the existing ER.

Reid “E” Research Facility
BBS at 219 8th Street
Parking Garage
Office Renovation
Biological Sciences Facility
Home Office Building with Expansion
ETRC Howe Hall
Utah Farm Bureau Center
Minnesota Farm Bureau Center
Union Drive Community Center Renovations
Catholic Pastoral Center Rehabilitation
Dodge House Renovations
College of Human Sciences
VRAC C6 and Office Suite
Camp Dodge Pool Campus Improvements
Camp Dodge Chapel Addition and Renovation
Coover Hall Infrastructure Study
Common Ground - Coffee Shop
Corporate Headquarters Renovation
Science Center - New Facility
Hub Tower Conference Center
Iowa City Federal Building - VHA Renovations
Hub Tower Office Tenant Improvement
Memorial Union Food Court
New Office
DSM Airport Energy Effiency Improvements
Extension 4-H Youth Building
Lied Recreation Center - New Heating Water Plant
MacKay Hall Auditorium Renovation
219 Eighth Street
Wyoming Farm Bureau Center
Arizona Farm Bureau Center
LeBaron Hall Replacement Study
Covered Walkway
Beardshear Hall Remodeling
Hub Tower Elevator Modernization
ABC - Office Build-Out
Geoffroy Residence Hall
Food Sciences Building - Room 2379 Renovation
Lance and Ellie's Sandwich Shop
Levitt Center for University Advancement
Corporate Highrise
IADA Office Renovation
Sabin Hall Renovation – LEED Gold
Executive Suites Renovation
Ames Lab Metals Development Air Handling Unit Replacement
Terminal
Iowa Events Center
ETRC Hoover Hall
Kemin Food Sciences Lab Renovation
© 2024 BBS Architects | engineers, All rights reserved.