BBS Architects Engineers

US Department of Veterans Affairs

VA – Hospital Emergency Room Renovation & Expansion
VA – Hospital Emergency Room Renovation & Expansion
VA – Hospital Emergency Room Renovation & Expansion
VA – Hospital Emergency Room Renovation & Expansion

Site Landscape Architecture and Civil Engineering: Partnering with Snyder & Associates
Project Data:

  • Relocate/Widen Circle Drive:
    • Cost: $1,505,000
  • Building Expansion and Renovation:
    • New Construction: 7,700 SF
    • Renovation 4,900 SF
    • Cost: $3,800,000

Construction Completed: 2013

The Emergency Department (ER) has outgrown its existing facilities and to accommodate the growth, a new addition and accompanying renovation of the current facilities is necessary. Design objectives include providing additional exam space to meet privacy requirements, improving staffing efficiency, accommodating drive-through ambulance bays on the site, accommodating a future second floor and integrating the addition architecturally with the adjacent facilities. In addition the ER entry and lobby will double as the public entrance to the Medical Center during nights and weekends.

Exam spaces are expanded from two shared and three private existing rooms to 10 private cart rooms and four exam rooms. A centralized nurse station improves staff efficiency. Dedicated access and egress drives to and from the new enclosed ambulance bays and a new public drop off canopy and drive with new parking spaces facilitate traffic flow and public wayfinding. The building addition is blended with the existing facility with matching brick and cast stone accents. A curved cast stone faced wall and new canopy delineates the public entrance. The public lobby and waiting areas feature ample daylighting and views to the exterior.

Construction is occurring in one site phase and three building phases. The site phase entails the relocation of a portion of the Circle Drive adjacent to the ER to provide adequate site area for the building addition, vehicular access, and visitor parking. Concrete retaining walls, paving, site utilities, and lighting comprise the project scope.

Building phases address the need to maintain continuous occupancy in the ER. The first phase is the construction of the entrance and waiting areas, followed by the remainder of the new addition including treatment spaces and concluding with renovation of the existing ER.

Sabin Hall Renovation – LEED Gold
Parking Garage
Biological Sciences Facility
VRAC C6 and Office Suite
College of Human Sciences
Extension 4-H Youth Building
New Facility
Catholic Pastoral Center Rehabilitation
219 Eighth Street
Levitt Center for University Advancement
ETRC Howe Hall
New Office
Hub Tower Office Tenant Improvement
Kemin Food Sciences Lab Renovation
Iowa City Federal Building - VHA Renovations
Dodge House Renovations
Corporate Highrise
Utah Farm Bureau Center
Hub Tower Conference Center
Office Renovation
Reid “E” Research Facility
ABC - Office Build-Out
Arizona Farm Bureau Center
ETRC Hoover Hall
Wyoming Farm Bureau Center
Beardshear Hall Remodeling
Memorial Union Food Court
Coover Hall Infrastructure Study
IADA Office Renovation
Minnesota Farm Bureau Center
Home Office Building with Expansion
Covered Walkway
Geoffroy Residence Hall
Camp Dodge Pool Campus Improvements
LeBaron Hall Replacement Study
Terminal
Corporate Headquarters Renovation
Food Sciences Building - Room 2379 Renovation
Lance and Ellie's Sandwich Shop
Executive Suites Renovation
Iowa Events Center
MacKay Hall Auditorium Renovation
© 2021 BBS Architects | engineers, All rights reserved.