Project Data:

  • Relocate/Widen Circle Drive:
    • Cost: $1,505,000
  • Building Expansion and Renovation:
    • New Construction: 7,700 SF
    • Renovation 4,900 SF
    • Cost: $3,800,000

Construction Completed: 2013

The Emergency Department (ER) has outgrown its existing facilities and to accommodate the growth, a new addition and accompanying renovation of the current facilities is necessary. Design objectives include providing additional exam space to meet privacy requirements, improving staffing efficiency, accommodating drive-through ambulance bays on the site, accommodating a future second floor and integrating the addition architecturally with the adjacent facilities. In addition the ER entry and lobby will double as the public entrance to the Medical Center during nights and weekends.

Exam spaces are expanded from two shared and three private existing rooms to 10 private cart rooms and four exam rooms. A centralized nurse station improves staff efficiency. Dedicated access and egress drives to and from the new enclosed ambulance bays and a new public drop off canopy and drive with new parking spaces facilitate traffic flow and public wayfinding. The building addition is blended with the existing facility with matching brick and cast stone accents. A curved cast stone faced wall and new canopy delineates the public entrance. The public lobby and waiting areas feature ample daylighting and views to the exterior.

Construction is occurring in one site phase and three building phases. The site phase entails the relocation of a portion of the Circle Drive adjacent to the ER to provide adequate site area for the building addition, vehicular access, and visitor parking. Concrete retaining walls, paving, site utilities, and lighting comprise the project scope.

Building phases address the need to maintain continuous occupancy in the ER. The first phase is the construction of the entrance and waiting areas, followed by the remainder of the new addition including treatment spaces and concluding with renovation of the existing ER.

ETRC Howe Hall
Corporate Headquarters Renovation
College of Human Sciences
Wyoming Farm Bureau Center
Utah Farm Bureau Center
Camp Dodge Chapel Addition and Renovation
BBS at 219 8th Street
Corporate Highrise
Science Center - New Facility
IADA Office Renovation
Reid “E” Research Facility
Home Office Building with Expansion
Executive Suites Renovation
Hub Tower Elevator Modernization
Sabin Hall Renovation – LEED Gold
Biological Sciences Facility
DSM Airport Energy Effiency Improvements
VRAC C6 and Office Suite
Beardshear Hall Remodeling
Kemin Food Sciences Lab Renovation
Lied Recreation Center - New Heating Water Plant
Minnesota Farm Bureau Center
Levitt Center for University Advancement
Catholic Pastoral Center Rehabilitation
ETRC Hoover Hall
Arizona Farm Bureau Center
Lance and Ellie's Sandwich Shop
Camp Dodge Pool Campus Improvements
Geoffroy Residence Hall
Hub Tower Conference Center
Parking Garage
Union Drive Community Center Renovations
LeBaron Hall Replacement Study
Common Ground - Coffee Shop
Office Renovation
Iowa City Federal Building - VHA Renovations
New Office
ABC - Office Build-Out
Covered Walkway
Extension 4-H Youth Building
Memorial Union Food Court
Coover Hall Infrastructure Study
Ames Lab Metals Development Air Handling Unit Replacement
Food Sciences Building - Room 2379 Renovation
Hub Tower Office Tenant Improvement
MacKay Hall Auditorium Renovation
219 Eighth Street
Iowa Events Center
Dodge House Renovations
Terminal
© 2023 BBS Architects | engineers, All rights reserved.